دورات هندسية

 

 

هام

مشاهدة نتائج الإستطلاع: لو مدير الشركه نزل الموقع بدون الخوزه

المصوتون
861. أنت لم تصوت في هذا الإستطلاع
  • اتركه

    47 5.46%
  • انصحه بلبسها

    407 47.27%
  • امنعه من نزول الموقع

    354 41.11%
  • اخلع بتاعتى و البسه له

    53 6.16%
صفحة 172 من 219 الأولىالأولى ... 72122162168 169 170 171 172173 174 175 176 182 ... الأخيرةالأخيرة
النتائج 1,711 إلى 1,720 من 2185
  1. [1711]
    مروان البرنس
    مروان البرنس غير متواجد حالياً
    عضو فعال جداً
    الصورة الرمزية مروان البرنس


    تاريخ التسجيل: May 2008
    المشاركات: 178
    Thumbs Up
    Received: 0
    Given: 0

    Post construction safety program 9

    11. Never work aloft if you are afraid to do so, if you are subject to dizzy spells, or if you are apt to be nervous or sick.

    12. Never move an injured person unless it is absolutely necessary. Further injury may result. Keep the injured as comfortable as possible and utilize job site first-aid equipment until an ambulance arrives.

    13. Know where firefighting equipment is located and be trained on how to use it.

    14. Lift correctly - with legs, not the back. If the load is too heavy GET HELP. Stay fit. Control your weight. Do stretching exercises. Approximately twenty percent of all construction related injuries result from lifting materials.

    15. Nobody but operator shall be allowed to ride on equipment unless proper seating is provided.

    16. Do not use power tools and equipment until you have been properly instructed in the safe work methods and become authorized to use them.

    17. Be sure that all guards are in place. Do not remove, displace, damage, or destroy any safety device or safeguard furnished or provided for use on the job, nor interfere with the use thereof.

    18. Do not enter an area which has been barricaded.

    19. If you must work around power shovels, trucks, and dozers, make sure operators can always see you. Barricades are required for cranes.

    20. Never oil, lubricate, or fuel equipment while it is running or in motion.

    0 Not allowed!



  2. [1712]
    مروان البرنس
    مروان البرنس غير متواجد حالياً
    عضو فعال جداً
    الصورة الرمزية مروان البرنس


    تاريخ التسجيل: May 2008
    المشاركات: 178
    Thumbs Up
    Received: 0
    Given: 0

    Post construction safety program 11

    21. Before servicing, repairing, or adjusting any powered tool or piece of equipment, disconnect it, lock out the source of power, and tag it out.

    22. Barricade danger areas. Guard rails or perimeter cables may be required.

    23. Trenches over five feet deep must be shored or sloped as required. Keep out of trenches or cuts that have not been properly shored or sloped. Excavated or other material shall not be stored nearer than two feet from the edge of the excavation. Excavations less than 5 ft may also require cave in protection in some instances.

    24. Use the "four and one" rule when using a ladder. One foot of base for every four feet of height.

    25. Portable ladders in use shall be equipped with safety feet unless ladder is tied, blocked or otherwise secured. Step ladders shall not be used as a straight ladder.

    26. Ladders must extend three feet above landing on roof for proper use.

    27. Defective ladders must be properly tagged and removed from service.

    28. Keep ladder bases free of debris, hoses, wires, materials, etc.


    29. Build scaffolds according to manufacturers' recommendations and MIOSHA Construction Safety Standard Part 12 - Scaffolding.

    30. Scaffold planks shall be properly lapped, cleated or otherwise secured to prevent shifting.

    0 Not allowed!



  3. [1713]
    مروان البرنس
    مروان البرنس غير متواجد حالياً
    عضو فعال جداً
    الصورة الرمزية مروان البرنس


    تاريخ التسجيل: May 2008
    المشاركات: 178
    Thumbs Up
    Received: 0
    Given: 0

    Post construction safety program 10

    31. Use only extension cords of the three-prong type. Use ground fault circuit interrupters at all times and when using tools in wet atmosphere (e.g. outdoors) or with any temporary power supply. Check the electrical grounding system daily.

    32. The use of harnesses with safety lines when working from unprotected high places is mandatory. Always keep your line as tight as possible.

    33. Never throw anything "overboard." Someone passing below may be seriously injured.

    34. Open fires are prohibited.

    35. Know what emergency procedures have been established for your job site. (location of emergency phone, first aid kit, stretcher location, fire extinguisher locations, evacuation plan, etc.)

    36. Never enter a manhole, well, shaft, tunnel or other confined space which could possibly have a nonrespirable atmosphere because of lack of oxygen, or presence of toxic or flammable gas, or has a possibility of engulfment by solids or liquids. Make certain a qualified person tests the confined area with an appropriate detector before entry, that the necessary safety equipment is worn. Standby person may be required to be stationed at the entrance.

    0 Not allowed!



  4. [1714]
    مروان البرنس
    مروان البرنس غير متواجد حالياً
    عضو فعال جداً
    الصورة الرمزية مروان البرنس


    تاريخ التسجيل: May 2008
    المشاركات: 178
    Thumbs Up
    Received: 0
    Given: 0

    Post construction safety program 12

    JOB SAFETY TRAINING



    A. After inspecting a job site, the safety person or other designated person will identify and evaluate all potential hazards for:

    1. Injury Severity potential.

    2. Probability of an accident.


    B. This person will also appraise the skill and knowledge level of exposed workers.


    C. Appropriate Training will be given.

    1. Hazards will be pointed out.

    2. Necessary precautions will be explained.

    3. The higher the hazard the more detailed will be the training.


    D. Records will be maintained for all training sessions with descriptions of topics covered and names of workers trained.

    0 Not allowed!



  5. [1715]
    مروان البرنس
    مروان البرنس غير متواجد حالياً
    عضو فعال جداً
    الصورة الرمزية مروان البرنس


    تاريخ التسجيل: May 2008
    المشاركات: 178
    Thumbs Up
    Received: 0
    Given: 0

    Post construction safety program 13

    SAFETY DISCIPLINE


    A. Three-Step System

    First violation: Written warning; copies to employee and employee's file.

    Second violation: Written warning; suspension for 1/2 or full day without pay.

    Third violation: Written report for file and immediate termination.



    B. Four-Step System

    First violation: Oral warning; notation for personnel file.

    Second violation: Written warning; copy for file or Personnel Office.

    Third violation: Written warning; one day suspension without pay.

    Fourth violation: Written warning and one-week suspension, or termination if warranted.


    C. A record will be maintained of all discipline.

    0 Not allowed!



  6. [1716]
    مروان البرنس
    مروان البرنس غير متواجد حالياً
    عضو فعال جداً
    الصورة الرمزية مروان البرنس


    تاريخ التسجيل: May 2008
    المشاركات: 178
    Thumbs Up
    Received: 0
    Given: 0

    Post construction safety program 14

    POWER LOCKOUT PROCEDURE



    Lockout procedure for Company.


    I. PURPOSE

    The purpose of this procedure is to assure that employees are protected from unintended machine motion or unintended release of energy which could cause injury.


    II. MANAGEMENT RESPONSIBILITIES

    A. Each supervisor shall train new employees and periodically instruct all of their employees regarding provisions and requirements of this lockout procedure.

    B. Each supervisor shall effectively enforce compliance of this lockout procedure including the use of corrective disciplinary action where necessary.

    C. Each supervisor shall assure that the locks and devices required for compliance with the lockout procedure are provided to their employees.

    D. Prior to setting up, adjusting, repairing, servicing, installing, or performing maintenance work on equipment, machinery, tools, or processes, the supervisor shall determine and instruct the employees of the steps to be taken to assure they are not exposed to injury due to unintended machine motion or release of energy.


    III. EMPLOYEES RESPONSIBILITY


    A. Employees shall comply with the lockout procedure.

    B. Employees shall consult with their supervisor or other appropriate knowledgeable management personnel whenever there are any questions regarding their protection.

    C. Employees shall obtain and care for the locks and other devices required to comply with the lockout procedure.

    0 Not allowed!



  7. [1717]
    مروان البرنس
    مروان البرنس غير متواجد حالياً
    عضو فعال جداً
    الصورة الرمزية مروان البرنس


    تاريخ التسجيل: May 2008
    المشاركات: 178
    Thumbs Up
    Received: 0
    Given: 0

    Post construction safety program 15

    IV. GENERAL

    A. The power source of any equipment, machine, tool, or process to be set-up, adjusted, repaired, serviced, installed, or where maintenance work is to be performed and unintended motion or release of energy could cause personal injury, such a power source shall be locked out by each employee doing the work. Sources of energy, such as springs, air, hydraulic and steam shall be evaluated in advance to determine whether to retain or relieve the pressure prior to starting the work.

    B. Safety locks are for the personal protection of the employees and are only to be used for locking out equipment.

    C. Safety locks, adapters, and "Danger Tags" can be obtained from a supervisor.

    D. Equipment locks and adapters can be obtained from a supervisor. The sole purpose of the "Equipment" lock and adaptor is to protect the equipment during periods of time when work has been suspended or interrupted. The locks are not to be used as a substitute for the employee's personal safety lock.

    E. Personal locks shall contain a tag with employee's name on it.

    F. One key of every lock issued shall be retained by the employee to whom it was issued and the only other key to the lock shall be retained by the superintendent.

    G. Employees shall request assistance from their supervisor if they are unsure of where or how to lockout equipment.

    H. Any questions concerning the lockout procedure should be directed to the employee's supervisor.

    0 Not allowed!



  8. [1718]
    مروان البرنس
    مروان البرنس غير متواجد حالياً
    عضو فعال جداً
    الصورة الرمزية مروان البرنس


    تاريخ التسجيل: May 2008
    المشاركات: 178
    Thumbs Up
    Received: 0
    Given: 0

    Post construction safety program 16

    LOCKING OUT AND ISOLATING THE POWER SOURCE

    A. Equipment, machines, or processing main disconnect switches shall be turned off and locked in the off position only after the electrical power is shut off at the point of operator control. Failure to follow this procedure may cause arching and possibly an explosion.

    B. Equipment/tools connected to over a 110 volt source of power by a plug-in cord shall have a locking device applied to the plug attached to the cord leading to the machine to be considered locked out.

    C. Equipment/tools connected to a 110 volt source of power by a plug-in cord shall be considered locked out if the plug is disconnected and tagged with a "do not start tag."

    D. After locking out power source, the employee shall try the equipment, machine, or process controls to ensure no unintended motion will occur; or test the equipment, machine or process by use of appropriate test equipment to determine that the energy isolation has been effective.

    E. When two or more employees work on the same equipment, each is responsible for attaching his/her lock. Safety locks and adapters are to be fixed on levers, switches, valves, etc. in the nonoperative (off) position.

    F. An employee who is assigned to a job and upon arrival finds an "Equipment Lock," "Adaptor," and "Danger Tag" affixed to the equipment shall take the following action:

    1. Affix his/her personal lock to the "Equipment Adaptor."

    2. Determine who placed the equipment out of service and contact all parties who have locks on the equipment to determine if the assignment to be performed would affect their safety. The assignment will proceed only if safe to do so with all parties involved.

    3. Try the controls to ensure no unintended motion will occur before starting work or qualified personnel shall test the equipment, machine, or process by use of appropriate test equipment to determine that the energy isolation has been effective. (Such testing equipment is only to be employed by trained qualified personnel.)

    0 Not allowed!



  9. [1719]
    مروان البرنس
    مروان البرنس غير متواجد حالياً
    عضو فعال جداً
    الصورة الرمزية مروان البرنس


    تاريخ التسجيل: May 2008
    المشاركات: 178
    Thumbs Up
    Received: 0
    Given: 0

    Post construction safety program 17

    VI. PERFORMING TEST AND ADJUSTMENTS DURING LOCKOUT

    A. Power may be turned on when it is required to perform tests or adjustments. All of the rules pertaining to removing locks and restoring power shall be followed. The equipment or process shall again be locked out if it is necessary to continue work after completing the test or adjustments.

    B. If the employee leaves the job before its completion, such as job reassignment, the employee shall remove his/her personal lock and adaptor and replace it with an "Equipment" lock and adaptor. In addition, the employee will prepare and attach a "Danger Tag" indicating the reason the equipment is locked out (should more than one employee be assigned to the job, the last employee removing his/her lock will be responsible for affixing the "Equipment" lock, adaptor and the "Danger Tag").

    C. Upon completion of the work, each employee will remove his/her lock, rendering the machine operable when the last lock is removed.



    D. The employee responsible for removing the last lock, before doing so, shall assure that all guards have been replaced, the equipment, machine, or process is cleared for operation, and appropriate personnel notified that power is being restored. This employee is also responsible for removing the "Equipment" lock and returning it to the supervisor.

    0 Not allowed!



  10. [1720]
    مروان البرنس
    مروان البرنس غير متواجد حالياً
    عضو فعال جداً
    الصورة الرمزية مروان البرنس


    تاريخ التسجيل: May 2008
    المشاركات: 178
    Thumbs Up
    Received: 0
    Given: 0

    Post construction safety program 18

    VII. EMERGENCY SAFETY LOCK REMOVAL

    A. The superintendent, or other designated management person, will be authorized to remove an employee's lock under the following conditions:

    1. Receipt of a written request signed by the appropriate supervisor which shall state the reason the employee is not able to remove the lock.

    2. The supervisor is responsible for making certain all the requirements for restoring power are followed.

    0 Not allowed!



  
الكلمات الدلالية لهذا الموضوع
2005, 2007, للأمن, للأخ, للمحترفى, للأخوة, للمشاركة, للمعدات, للمناقشه, للمنفعة, لماذا, للافادة, ممتاز, للتدريب, للجميع, لمحة, للخبراء, للخدمة, للحجاج, للحريق, للحوادث, للدكتور, للرجل, للزملاء, للسلالم, للسادة, للسائقين, لمشاكل, للشركات, ملصقات, للعمل, للعاملين, للغياب, ملف, ملفات, لله, لأهل, للإجابة, لمن, لمؤتمر, لمنتدى, للنيبوش, للوقاية, ممكن, مال, accident, مادة, لايحدث, لاخوانى, ماهي, ماهر, ماهو, مائية, لذوي, مبادئ, آثار, أبحث, متخصصي, متخصصه, مبروك, لبناء, متواضعة, أحمد, لجميع, مجمع, مجموعة, مجموعه, أيام, محاضرات, محاضرة, مخاطر, محتاج, أختبار, ميدان, لدية, محددة, لدينا, مخخط, أجرا, لحرارة, أخرى, محصلة, ميزانية, محسن, آيه, أجهزة, لخطوط, amounia, أرامكو, مراجع, مراجعة, مراقبة, مرحبا, أريد, أرجو, مروري, مشاركة, مساعدة, مساعدةعن, مساعده, مساويء, مستعجلة, مستقبل, مصر, مشروع, أسفل, لصناعة, أسناني؟؟, aramco, arrest, assessment, لعمل, أعمال, أغلب, معلومات, معلوماته, أغرب, معرض, أعضاء, مفیده, أفلام, أفادكم, أفيدوني, أهم, أهمية, مهمه, مهام, مهامها, لإيجاد, لإظهار, مهنية, مهندس, مهندسي, مهندسين, مواصفة, مناعة, مواضيع, مواقع, منتدى, منير, منَ, منزلك, أنشاء, أنزور, لنغير, منظومات, أنواع, موضوع, موضوعين, موقع, منكم, أطلب, لطلبة, مطلوب, مطلوبه, مطب, لطيف, مقال, مقتل, أقتراح, مقدمه, لكم, مكافحة, مكان, لكتاب, لكن, bloodborne, boox, box, building, الیکم, الأ, الملتقى, المميزة, المميزين, الأمراض, الأمن, المايكروويف, المذكور, المجالات, المياه, المخاطر, الأحبةاحتاج, الأجهزة, الأخوات, المدنية؟, الميكانيكية, المراكز, المساحية, المشاركات, المشاركة, الأساسية, المساعدة, المساهمه, المستخدمة, المستشفيات, المستودعات, المصرى, الأسنان, المعادن, المعدنية, الله, المهنیه, المهنية, المهندس, المهنيه, الآن, الأولى, المواد, المواضيع, الموبايل, المنتج, المنتدى, المنشأ, المنشآت, الأوشا, الأنظمة, الموعد, الأنفاق, اللون, الموضوع, الموقع, المطارات, الأطباء, المقاولات, المكاتب, الامريكية, الامن, الامن والسلامة, الالوان, الامنة, الالكترونيه, الاباء, الاتصالات, الاخ, الاحمال, الاحتياجات, الاحتراز, الاخرى, الايزو, الاخوة, الاخوه, الارتفاعات, الاستاذ, الاستاتيكيه, الاستخدام, الاستشاريه, الاسعافات, الاسنان, الاعزاء, الاولية, الانابيب, الاوسط, الانضمام, الاضافات, الاطفال, البلاتينية, البلاستيكية, البلدان, التميز, التأريض, البترول, البترولية, التي, البخارية, البديل, التدخين, التحيه, البيئة, البيئه, التدقيق, البرق, التشييد, البصرية, التصوير, التعرض, البناء, التواصل, التكييف, الى, الحل, الحماية, الحمايه, الجميع, الجامعة, الخاصه, الحرائق, الحريق, الحروق؟نصيحة, الجزائر, الجزائرية, الجزير, الحصول, الدعوة, الحفاظ, الحفر, اليه, الدولية, الجوااااااال, الحوادث, الجوجل, الجويه, الدورة, الخطره, الnasp, الري, الرجل, الرعد, السیطره, السلالم, السلامة, السلامةو, السلامه, الشمس, السمعية, السالب, السابقة, الصاج, السبت, السياره, الصداقة, الصحة, الصحي, السيجارة, الزيركون, الشخصية, الشده, السرعات, السرعه, الصرف, الشرق, الشرقية, الosha, الصعود, السعودية, السفن, الصناعي, الصناعية, الصواعق, السويس, السطحية, الزقازيق, السقوط, الشكر, carbon, الrisk, العلم, العليا, العالم, العالمين, العامة, العالي, العامه, الغازات, الغرب, العربي, العربية, الظهر, العواصف, العضلات, الغضب, الفتلة, الـتأهيلية, الفياغرا, الفرق, الفنية, الهيدروجين, الإخوة, الهواء, الهندي, الهندسة, الهندسية, الإطارات, الناس, النيبوش, الوصول, الوظفيه, الوطنية, الوقاية, الوقائي, الضغظ, الضغط, الکتاب, الطائره, الطبيعية, الطيور, الطريق, الطرق, القلب, القاهرة, القيادة, القوانين, القوى, القطع, الكيميائية, الكرام, الكهرمغناطيسية, الكهرباء, الكهربائة, الكوارث, certified, اثناء, احمد, ادارة, اجازه, اختبر, ادخل, اجهزة, اخوات, اخواني, اريد, ارجو, ارجوكم, ارشادات, اسمله, اصابات, ازاى, استجابة, استخدام, استعمال, استعمالها, استفاده, استفسار, اسبوع, color, construction, consultant, crane, اعمال, اعادة, اعتذار, اعتقد, اعدادى, اعرف, افلام, افتتاح, افيضو, اهمال, اولا, اولى, انا, انترسيك, انجليزي, انشا, انقذوا, اطفالنا, اقتراح, اقتراحي, اكثر, data, databaseprogram, ذلك, design, dioxide, dtm, تأثير, تلوث, تموج, بمنطقة, بالمملكة, بالمتندي, بالأشعة, بالمواد, بالسلامة, بالسيارات, بالسعودية, بالصور, بالعيد, تتخلص, تبين, بترول, بدأ, تخلى, تحليل, بجميع, بجمهورية, بجامعة, تجاهل, بيانات, تحذير, بدت, بحثيه, تحبني, تحية, تحديد, بخير, بخصوص, بيسط, تجهيزات, بين, بحوث, بدون, engineering, ترددات, environmental, برنامج, تسمحو, بشأن, تساؤل, بسبب, تزيد, تشخيص, بسيط, تسرب, بشرح, تشريعات, بسررررعة, equipment, تعمل, تعليمات, تعال, تعبئة, بعد, تعيل, بعنوان, تعقدها, exam, excavation, تهبط, تهنئه, توجيهية, توضيحية, تنكات, تطبيقي, ثقافة, تقديم, تقرير, بقواعد, تقنية, تكساس2008, تكنب, facilities, fall, finding, fire, flash, food, free, gas, green, h2s, hazards, hazwoper, health, hose, hscode, hse, hsems, حماية, دمج, جميل, حمدى, جمعيات, حلو, يالله, خالد, يامهندسين, يالقاهرة, داخل, ياجماعه, حاجة, حادثة, خاصة, خاصه, خاطر, جدا, جداً, يجب, يجيبني, خيرا, يحوز, يحقق, ilo, impact, important, imroving, incident, دراسه, indicators, حريق, injury, inspector, investigation, جسم, حساب, يساعد, يستر, يشرح, items, دعابه, دعوة, يعود, دعوه, يعقل, حفر, حول, حولتطبيقات, حولنا, حوادث, يؤثر, يوجد, دور, دورات, دوران or استخلاص, دورة, دورتي, دوره, يضم, خطة, خطير, خطر, خطط, حكايتكم, layout, lifiting, lockout or tagout, lockouttagout, lpg, lti, managmen, msds, msha, mus, رأيكم, nasp, راجعون, nebosh, newly, ربنا, nffss, nfpa12, nfssi, رجاء, noise, سلام, سلامة, سمحتم, سمحتم؟, سمعك, شاملة, سارة, ساعات, ساعدوني, سبل, سببها, ستفقدة, صيام, سيارتك, صيانة, سيد, سيجارة, زراعة, شرعية, شركات, شركة, osha, oshas, صغير, شهادات, سوال, سؤالى, صناعي, شوب, صور, سوف, سطح, شكر, performance, personal, planet, point, pollution, powerpoint, presentation, presentations, procedures, process, professional, program, protection, protective, register, related, required, risk, rso, safe, safely, safety, safty, sample, sayed00, scaffold, scaffolding, smart, software, step, suppression, systems, talk, technologies, tool, towers, training, علی, عمل, علمكم, علاج, على, عام, عامة, عامه, عاجل, عاجله, عايز, غاز, عيد, عيدكم, عيوب, عيون, عربي, عربية, غريبة, غرفه, عرض, غسالة, عشان, updated, urgently, عواقبها, ظني, عندي, عنوان, عطرة, عقد, welding, wmsd, working, workplace, workrelated, written, فی, فايل, فيديو, فحص, فريضة, فصل, فصل؟؟, فوق, إمكانية, هام, هامة, هذا, هذه, إختبارات, إجراء, إرجاعها, إستخدام, إستفسار, إعادة, إعصار, هنا, هندسيه, إنفجار, إقتراح, ولا, ومساعدة, ومساوىء, وأهميتة, ولو, ومنع, وأكسب, والأمن, والمتطلبات, والمخاطر, والمركبات, والمهندس, والمناجم, والمكتسبات, والا, والاعضاء, والحماية, والخطرة, والزملاء, والسلامة, والسلامه, والصحة, والصحه, والغاز, والوقاية, والقدر, والقضاء, نايميين, واجب, واحد, واحصائيات, واخواتي, وارشادات, وانتم, وبتر, وتجديدها, وبديهتك, ندمج, وجزيتم, ودعوة, وخفيف, وجه, ودورها, ورقة, وسلامة, وصلة, وصلني, وسائل, نصيحة, وزوار, وعلامات, وعاجل, وظائف, وظيفة, نعنوع, نفعة, وإذاكان, وهي, وإصابات, نهني, ونبارك, ونص, نوعية, وضمور, وقصتها, وقوانين, وكل, ضربت, ضعيفه, ضغط, ؟؟؟, طلب, طازج, طبيب, طفايات, قادم, قاعدة, قبل, قيم, قراّن, قسم, قفزة, قواعد, قوانين, قوى, قنينة, قطاع, كلية, كامل, كامله, كتاب, كتب, كثير, كبريتيد, كيابل, كيف, كيفية, كُتب, كهرباثي, كوارث, كود