    choose the correct word from the list:(client, surveyor, contractors, plasters, carpenters,joiners, workmen,tillers,glaziers, sub-contractors,architect)
    1-)the........receives a commission from the............

    2-)the........measures the plot of land and makes a plan.
    3-)..........bid for the job of constructing the building .
    4-)the work of independent crews known as.........is coordinated by the contractor.
    5-)the...........mix cement ,sand,pebbles,and water to make concrete.
    6-)rough woodwork is done on the house by...........
    7)the woodwork is finished by the..........




    fill in blanks with the following words :

    ( swollen , fine , durable accelerating , preparation , tensile , process , course , density , reinforced , reaction , bind , mix , compressive)

    1). you have to .............. cement paste and aggregates to make concrete .

    2). cement paste is used to .............. the aggregate to make concrete .

    3). cement hardens through a chemical .............. called hydration .

    4) ............... concrete has foreign materials added to it to take a ........... load .

    5) fine sand can be used in the .............. of lightweight concrete .

    6) concrete has a high .......... force .

    7) large aggregates are known as ............ , while small aggregates are called ............ .

    8) concrete is used for construction because it is ............... .

  2. [2]
    رزق حجاوي
    رزق حجاوي موجود حالياً

    إستشاري الهندسة المدنية


    الصورة الرمزية رزق حجاوي


    تاريخ التسجيل: Mar 2008
    المشاركات: 7,648
    Thumbs Up
    Received: 4,986
    Given: 1,442
    1-)the... Contractors.....receives a commission from the. Architest.

    2-)the...Surveyor.....measures the plot of land and makes a plan.
    3-)........bid for the job of constructing the building .
    4-)the work of independent crews known as.........is coordinated by the contractor.
    5-)the.......Workmen....mix cement ,sand, pebbles, and water to make concrete.
    6-)rough woodwork is done on the house by....Joiners.......
    7)the woodwork is finished by the...Glaziers.......





    swollen , fine , durable accelerating , preparation , tensile , process , course , density , reinforced , reaction , bind , mix , compressive)

    1). you have to ....Mix.......... cement paste and aggregates to make concrete .

    2). cement paste is used to ...Bind........... the aggregate to make concrete .

    3). cement hardens through a chemical ....Reaction.......... called hydration .

    4) Reinforced. concrete has foreign materials added to it to take a ...Tensile.. load .

    5) fine sand can be used in the Preparation of lightweight concrete .

    6) concrete has a high .... Compressive...... force .

    7) large aggregates are known as Course., while small aggregates are called Fine.

    8) concrete is used for construction because it is ...............

    0 Not allowed!



  3. [3]
    هاني سليمان
    هاني سليمان غير متواجد حالياً
    عضو متميز
    الصورة الرمزية هاني سليمان


    تاريخ التسجيل: Oct 2006
    المشاركات: 963
    Thumbs Up
    Received: 16
    Given: 1
    اعتقد ان الاسئلة سهلة لو بحث عن اجابة... عليك البحُُُُُُُُُُُُُُُُُُُُُُُُُُثثثثثثثثثثثثثثثثثث

    0 Not allowed!



  4. [4]
    ماجدان
    ماجدان غير متواجد حالياً
    عضو متميز


    تاريخ التسجيل: Oct 2007
    المشاركات: 2,157
    Thumbs Up
    Received: 99
    Given: 8
    السلام عليكم
    فعلا الأسئله سهله جدا .......... كان مع قليل من البحث كل شىء يبقى تمام
    شكر للمهندس رزق على كل المشاركات عموما
    وإن كنت أرجح ان يتم م.بندر البندر حلها بنفسه بعد البحث فى تلك المواضيع إذ انها فى غاية السهوله
    شكرا للجميع

    سالدان للهندسه والإنشاءات

    0 Not allowed!


    ماجدان للهندسه والإنشاءات

    التنفيذ بالموقع من الألف إلى الياء

    م.أحمد جليدان

  
الكلمات الدلالية لهذا الموضوع

عرض سحابة الكلمة الدلالية

RSS RSS 2.0 XML MAP HTML