    Industrail Engg dept Hierarchy

    Recently I joined socks manufacturing company, I appointed as junior Asst manager in Industrial engineering department. I.E department goes under Production (knitting & seaming) manager, production manager wants to restructure I.E department to the following sections

    1. training
    a) technical training
    b) general training

    2. layout designing and relocation

    3. work study
    a) method study
    b) work measurement

    4. planning costing and capacity calculation ( recently this function done by Product planning & development department)

    5. changeover and WIP (this one also done by PPD department)

    Changeover includes
    a) programming the machines
    b) machine setting
    c) yarn feeding
    d) removing old yarn

    Work in process (WIP)
    The main function of WIP section is to monitor and control socks handling from dept to another and count socks quantity (accountability).

    We have 4 stations for WIP, between departments e.g. 1 station b/w knitting and seaming, 1 b/w seaming and dying and 2 b/w dying and finishing department

    The manager when preparing the Hierarchy, he put change over and WIP in one box, and he make 10 sub-boxes under this section (please see excel attached file)
    My question is that what are the possible designations/ positions can come under (change over and WIP) Hierarchy ????

    I.E dept orgonogram is attached

    Waiting your valuable suggestions

    Regards
    [/LEFT
    [/CENTER][/RIGHT]
    ]