    1. Purpose
    This procedure describes how it is ascertained that design documents from architects/consultants are reviewed and coordinated and how it is documented.

    2. Scope
    The procedure is limited to describe the design review and coordination activities Egydan performs.

    Definition: Design review: A documented, comprehensive and systematic examination of a design to evaluate its capability to fulfil the requirements for quality, unambiguousness, completeness and to identify problems, if any, also propose the development of cost saving alternative solutions.
    A design review can be conducted at any stage of the design process, but should, in any case, be conducted at the completion of this process.(Based on ISO 8402:1995/3.11)

    3. References
    ISO 9001/1994 section 4.4 “Design Control”.

    4. Responsibility
    The Quality Manager is responsible for maintaining the procedure.
    The Project Manager has the responsibility for the implementation of the procedure.
    The Technical Manager has responsibility to manage the procedure requirements.

    5. Procedure

    5.4.1 General (ISO 9001: 1994/4.4.1)
    Design management communication/(interfaces) between Egydan, the owner and his appointed consultants are in general in the form of document transmittals, meetings, review reports and correspondences.

    5.4.2 Design planning and organizational / technical interfaces (ISO 9001: 1994/4.4.2 and 4.4.3)
    Egydan works out a time schedule for design documents, which is updated biweekly or as required.
    The time schedule reflects design activities/interfaces for the project.

    Design interface and co-ordination are carried out in accordance with the typical design procedure described in the attachment no. 1 “Description of the interface between owner, consultants and Egydan” & attachment no. 2 “Design sequence for document production”. The typical design procedure is a sequential activity repeated for each building type as reflected in the time schedule.
    The time schedule provides regular design reviews for the purpose of identifying and recording any design constraints and interface problems.

    5.4.3 Design input (ISO 9001/4.4.4)
    The Design is based on schematic design provided by the owner, modifications of these to comply with governmental regulations, Egyptian codes and standards.

    5.4.4 Design output (ISO 9001/4.4.5)
    The architects and consultants are responsible to ensure that design input requirements are met by internal reviews, coordination and implementation of review comments from the involved parties. The Design output - the final design documents are stamped “GOOD FOR CONSTRUCTION” by each consultant and architects for his documents.
    The Architects finally stamp “COORDINATED WITH OTHER CONSULTANTS” on their documents as well as on all involved consultants drawings.

    5.4.5 Design review and coordination (ISO 9001:1994/4.4.6and 4.4.7)
    A program of interrelated design reviews is established and determined in the time schedule as well as in attachment no. 1 and 2 to identify when such reviews will take place at specific stages of the design during the life of the project.

    Design reviews/scope of Egydan responsibility
    Egydan carries out review of design documents, as the consultants prepare them with the purpose of:
    • Recommending alternative solutions whenever design details affect feasibility
    • Ascertaining if areas of jurisdiction overlap
    • Verifying that all work has been included and allows for phased construction
    • Ascertaining that all foreseeable details are included in the drawings/documents and that there is no conflicting information on any of the drawings/documents.
    • Ascertaining that structural members are designed to the economical optimum.
    • Ascertaining that all consultants have stamped their respective drawings/documents “GOOD FOR CONSTRUCTION”
    • Ascertaining that the architects have consequently stamped all drawings “COORDINATED WITH OTHER CONSULTANTS”.

    Coordination
    Egydan carries out design coordination on one discipline level (drawings, specifications, B.O.Q. s and Cost estimate of the same trade) for completeness and multi discipline level (drawings, specifications, B.O.Q. s and Cost estimate from different trades) to avoid ambiguity.

    The design reviews and coordination are recorded in Egydan Form QF-015 “Design Review and Coordination report” (Attachment No. 3) and Form QF-017 “Drawing coordination transmittal” (Attachment No. 5)

    Meetings.
    In order to coordinate and ascertain that the consultants and architects handle design comments accordingly, Egydan conduct coordination meetings between the parties. These meetings are called for in necessary stages of the design /or whenever needed with agenda and recorded in minutes of meeting. (Attachment No. 7 & 8)

    Monitoring of design activities.
    Egydan monitors the progress of design activities to ensure that design documents from architects and consultants are received and submitted according to the time schedule and record the status in Form No. QF-014 (Attachment No. 12). Delays will be recorded and concerned party will be notified.

    Communication between architects, consultants and owner:
    Managing and control of communication and transfer of design documents/data are carried out according to the document/data control procedure. Documents used to transfer these are, but not limited to: Letters, Faxes, Transmittal letters, design review & coordination report, request of drawing copies, drawing coordination transmittal, minutes of meeting, and follow up construction documents.


    5.4.6 Design Validation (ISO 9001: 1994/4.4.8)
    Design validation review is carried out to ensure that the design documents conform to the agreed design requirements (section 5.4.3) so that the final design documents can be stamped “RELEASED FOR CONSTRUCTION” by EGYDAN.


    5.4.7 Design Changes (ISO 9001: 1994/4.4.9)
    All project changes and modifications must be identified and documented. To control design changes Egydan carries out a review according to section 5.4.5 in order to define consequences on time and cost before they are sent for Dreamland’s approval.
    Design changes will be initiated in Form no. QF-0XXX “Request for Design Change” (Attachment No. 9), approved by and accepted by Egydan before implementation.

    Egydan ensure necessary changes are implemented and reviewed by the consultant upon receipt.

    6. Attachments
    Attachment no. 1 “Description of the interface between owner, consultants and Egydan”
    Attachment no. 2 “Design sequence for document production”
    Attachment no. 3 Form No. QF-015 “Design Review & Coordination Report”
    Attachment no. 4 Sample of Form No. QF-015
    Attachment no. 5 Form No. Form No. QF-017 “Drawing Coordination Transmittal”
    Attachment no. 6 Transmittal letter COF-005
    Attachment no. 7 Paradigm PME-007 “Meeting agenda”
    Attachment no. 8 Paradigm PME-006 “Minutes of meeting”
    Attachment no. 9 Form no QF-XX “Request for Design Change”
    Attachment no. 10 Form no. QF-009 “Request for Drawing Copies”
    Attachment no. 11 Form no. QF-014 “Follow up construction documents”

    0 Not allowed!



  2. [12]
    محمود حازم عياد
    محمود حازم عياد غير متواجد حالياً
    مشرف متميز (استشارى برامج إدارة مشاريع)
    الصورة الرمزية محمود حازم عياد


    تاريخ التسجيل: Oct 2006
    المشاركات: 675

    وسام مشرف متميز

    Thumbs Up
    Received: 46
    Given: 0

    شكر ورجاء

    أشكرك عزيزى على المشاركة الرائعة ولكنى أرجو أن تنسقها وتحولها الى word أو pdf وتقوم بأعادة طرحها لنستفيد منها ونحتفظ بها وأشكرك على كلمتك الجميلة فى مشاركة الأخ shartooh
    بعنوان تحية لمحمود حازم

    0 Not allowed!



  3. [13]
    ام نورا
    ام نورا غير متواجد حالياً
    عضو متميز
    الصورة الرمزية ام نورا


    تاريخ التسجيل: Jun 2007
    المشاركات: 216
    Thumbs Up
    Received: 60
    Given: 0
    بعد اذن المهندس الطبلاوي
    واستجابة لمشرفنا الفاضل
    هذا رابط للملف بعد تنسيقه فضلت طرحه بصيغة WORD
    بحيث يتمكن مستخدمه من تعديله بما يتناسب مع مشروعه وتنسيقه كما يرتأي
    http://www.4shared.com/file/42329108...LITY_PLAN.html

    0 Not allowed!



  4. [14]
    تامرالمصرى
    تامرالمصرى غير متواجد حالياً
    عضو متميز
    الصورة الرمزية تامرالمصرى


    تاريخ التسجيل: Jan 2008
    المشاركات: 429
    Thumbs Up
    Received: 8
    Given: 1
    مشاركة رائعة اخونا العزيز وشكر خاص للاخت ام نورا السباقة دائما بالخير

    0 Not allowed!


    تامر المصرى
    Planner Engineer
    Associated Consulting Engineers Company
    Oman
    يا ريت تدخل هنا علشان تتضاعف حسناتك ولا تنسى الدعاء لكل من بالملتقى
    http://www.shbab1.com/2minutes.htm

  5. [15]
    عمر الفاروق
    عمر الفاروق غير متواجد حالياً
    عضو متميز جداً
    الصورة الرمزية عمر الفاروق


    تاريخ التسجيل: Apr 2006
    المشاركات: 1,505
    Thumbs Up
    Received: 80
    Given: 0
    اقتباس المشاركة الأصلية كتبت بواسطة ام نورا مشاهدة المشاركة
    بعد اذن المهندس الطبلاوي
    واستجابة لمشرفنا الفاضل
    هذا رابط للملف بعد تنسيقه فضلت طرحه بصيغة WORD
    بحيث يتمكن مستخدمه من تعديله بما يتناسب مع مشروعه وتنسيقه كما يرتأي
    http://www.4shared.com/file/42329108...LITY_PLAN.html
    اشكرك اختي الفاضلة ام نورا ..وعلي العموم باقي الملفات طرفي ولكن عندي مشكلة في رفع الملفات ...واتمني باذن الله التوفيق في رفع باقي الملفات

    0 Not allowed!



  6. [16]
    الجنزوري محمد
    الجنزوري محمد غير متواجد حالياً
    عضو متميز


    تاريخ التسجيل: Nov 2006
    المشاركات: 290
    Thumbs Up
    Received: 5
    Given: 1
    مشكور يا جميل على المشاركة الجميلة

    0 Not allowed!



  7. [17]
    assman
    assman غير متواجد حالياً
    جديد


    تاريخ التسجيل: Dec 2008
    المشاركات: 1
    Thumbs Up
    Received: 0
    Given: 0
    شكرا جزيلا ، كتاب جيد

    0 Not allowed!



  8. [18]
    anwerbasha
    anwerbasha غير متواجد حالياً
    عضو فعال جداً
    الصورة الرمزية anwerbasha


    تاريخ التسجيل: Nov 2006
    المشاركات: 229
    Thumbs Up
    Received: 6
    Given: 6
    استاذ من يومك
    موفق يا استاذي
    M.anwer

    0 Not allowed!


    Engr./M O H A M E D

  9. [19]
    ابودانه 2006
    ابودانه 2006 غير متواجد حالياً
    عضو


    تاريخ التسجيل: Mar 2007
    المشاركات: 25
    Thumbs Up
    Received: 0
    Given: 0
    يسلمووووو خيو ويسلمو ام نورا على الترتيب

    0 Not allowed!



  10. [20]
    عمر الفاروق
    عمر الفاروق غير متواجد حالياً
    عضو متميز جداً
    الصورة الرمزية عمر الفاروق


    تاريخ التسجيل: Apr 2006
    المشاركات: 1,505
    Thumbs Up
    Received: 80
    Given: 0

    لمن يحسب انه تلميذ وهو استاذ الاساتذة مهندس أنور

    اقتباس المشاركة الأصلية كتبت بواسطة anwerbasha مشاهدة المشاركة
    استاذ من يومك
    موفق يا استاذي
    M.anwer
    العزيز الغالي مهندس محمد أنور كل عام وانت واسرتك بخير ...يا صديقي لست استاذك ... ولكن الفترة الجميلة التي عملت معك كانت رائعة ...وفرصة جميلة لنتلاقي عبر المنتدي ..واخبرك ان صاحب الفضل استاذنا المهندس أحمد حمدي ...ولم أكن غير ناقل لما تعلمته منه خلال 8 سنوات ...علي العموم استعد بقوة لطرح ملفات ومشاركات جديدة ....واتمني من الله لك ولاستاذنا .م أحمد الصحة والعافية ومبروك يا حاج محمد ...جعلها الله حجة مبرورة...

    0 Not allowed!



  
صفحة 2 من 4 الأولىالأولى 1 23 4 الأخيرةالأخيرة
الكلمات الدلالية لهذا الموضوع

عرض سحابة الكلمة الدلالية

RSS RSS 2.0 XML MAP HTML