    Brothers please help..
    I’ve just join the project planning, I have been giving a small exercise
    To prepare schedule for very small plant.
    The project will start for Example 1-05-2010
    The land need to be prepare we need some equipment like reactors, air filter. heat exchanger, coolers, pumps, compressors.

    Reactor need to be build on ( concrete structure ) Compressor is in a compressor house ( shed )

    If you can help me I need the task to be done on level 3 with duration only.
    Then I can schedule it on primavera.


    this is my e-mail qtr141*************

  2. [2]
    kazanova721
    kazanova721 غير متواجد حالياً
    عضو


    تاريخ التسجيل: Apr 2007
    المشاركات: 29
    Thumbs Up
    Received: 0
    Given: 0

    Details

    dear engineer
    provide me with details or attach the drawings & BOQ in order to allow me to study the project & help u.

    0 Not allowed!



  3. [3]
    ORYX_GTL
    ORYX_GTL غير متواجد حالياً
    عضو


    تاريخ التسجيل: Nov 2005
    المشاركات: 14
    Thumbs Up
    Received: 0
    Given: 0
    thank you very much
    actually they didnt provide me with anything they said i have to make an estimates (any steps i think should be there) and duration.

    so its just to show them what task should be there
    i appreciate ur help brother

    0 Not allowed!



  4. [4]
    ORYX_GTL
    ORYX_GTL غير متواجد حالياً
    عضو


    تاريخ التسجيل: Nov 2005
    المشاركات: 14
    Thumbs Up
    Received: 0
    Given: 0
    Engineering procurment and construction should be coverd