    Flow Process Analysis (FPA): Analyses a process into a sequence of process elements in the order in which they occur

    Flow Processing/Flow Production: An efficient method of converting raw material into finished product eliminating or minimising transportation, handling of parts and work in progress

    Lead Time Analysis: Activity to identify the elements of lead time to measure how long a customer has to wait before receiving a product

    Lead Time: The total time a customer, internal or external, must wait to receive a product after placing an order

    Lead Time Profiles: Activity to identify and quantify factors that determine how quickly a product reaches the next or end customer

    Lean Manufacturing: A business performance improvement tool that focuses on enhancing quality, cost, delivery and people. Exposes waste and makes continuous improvement possible

    Levelled Production: A means of evenly distributing both the quantity and variety of parts across a production period avoiding overburden and under-utilisation in the workplace

    Mistake/Error Proofing (Poke Yoke):Means for eliminating defects by making a process robust to mistakes (foolproof)

    Process Mapping: Method for depicting a process, material or information flow in a diagrammatic form. Defines key process input and outputs

    Pull System: A customer driven work replenishment system involving 'pulling' the exact quantity of parts required out of a finished parts stores. A Kanban issues the instruction to replenish the stock

    Push System: Description of the process involving manufacturers launching materials and components required to product goods according to a production plan

    Root Cause: The real cause or origin of a problem

    Sigma: A measure of variation from the mean which when applied to the business process represents the number of defects or failures likely to occur per million opportunities

    Single Minute Exchange of Dies (SMED) (Set Up Reduction): Method for reducing tool changeover times facilitating increased capacity, smaller batch sizes, lower inventory and reduced lead times

    Six Sigma: A 'measure of goodness' involving the application of statistical methods to business processes to improve operating efficiency, reduce variation, avoid defects and reduce waste

    Supply Chain Map: Diagrammatic identification of basic logistical and cost details in the supplier-customer procession

    Takt Time: Takt is the German word for 'beat' and represents the pace at which the customer requires the product. Takt time is the rate at which parts have to be produced to match the customer requirements

    Total Productive Maintenance: Activity that targets zero downtime of machinery/equipment, zero defects and zero accidents by the pro-active identification of potential problems

    Value Stream: A value stream is all the actions, (both value added and non-value added), that are required to bring a product through the main flows essential to nearly every product

    Value Stream Mapping: A pencil and paper improvement tool that provides an understanding of the flow of material and information as a product makes its way through the value stream

    Value Management: Process that establishes the most reliable performance which a product or process must do to make it work and sell at the least possible cost

    Workplace Organisation: Uncluttered and orderly management of the working environment

    Zero Defects: Manufacturing free from faults achieved by the elimination of errors in a product or process

  2. [2]
    ferasgolf
    ferasgolf غير متواجد حالياً
    عضو فعال


    تاريخ التسجيل: Aug 2006
    المشاركات: 52
    Thumbs Up
    Received: 0
    Given: 0
    شكرا جزيلا لك على هذه المصطلحات الهمة
    وننتظر منك المزيد

    0 Not allowed!


    شكوت إلى وكيع سوء حفظي فارشدني إلى ترك المعاصي
    وقال بان العلم نور ونور الله لا يهدى لعاصي

  3. [3]
    Shibani
    Shibani غير متواجد حالياً
    عضو فعال


    تاريخ التسجيل: Dec 2006
    المشاركات: 81
    Thumbs Up
    Received: 0
    Given: 0
    شكرا علي المرور وأن شء الله نضع المزيد

    0 Not allowed!



  4. [4]
    bazokka
    bazokka غير متواجد حالياً
    عضو


    تاريخ التسجيل: Apr 2007
    المشاركات: 37
    Thumbs Up
    Received: 0
    Given: 0
    نشكرك على هذه المصطلحات ونرجو المزيد طبعا ولكن عايزين نبقى محددين ونعرف الناس المصطلحات ديه معناها ايه بالعربى

    0 Not allowed!



  5. [5]
    عبدالله الرشدان
    عبدالله الرشدان غير متواجد حالياً
    عضو فعال


    تاريخ التسجيل: Aug 2006
    المشاركات: 106
    Thumbs Up
    Received: 1
    Given: 0
    شكرا جزيلا على جهودك الطيبة

    0 Not allowed!



  6. [6]
    صناعة المعمار
    صناعة المعمار غير متواجد حالياً
    عضو شرف


    تاريخ التسجيل: Sep 2005
    المشاركات: 1,365

    وسام الشكر

     وسام كبار الشخصيات

    Thumbs Up
    Received: 8
    Given: 0
    بسم الله الرحمن الرحيم

    بارك الله بك اخي :)

    0 Not allowed!






    اللهم لك الحمد حمداً كثيراً ولك الشكر شكراً كثيرا ، حمداً كما ينبغي لجلال


    وجهك وعظيم سلطانك ،،،


    لك الحمد ما أكرمك


    ولك الحمد ما أرحمك


    ولك الحمد ما أعظمك


    اللهم أننا نشهدك أننا نشتاق إليك فلا تحرمنا من لذة القرب منك في الدنيا ولا


    لذة النظر إلى وجهك الكريم في الآخرة


  
الكلمات الدلالية لهذا الموضوع

عرض سحابة الكلمة الدلالية

RSS RSS 2.0 XML MAP HTML