دورات هندسية

 

 

مشاريع قمتم بتنفيذها

صفحة 11 من 14 الأولىالأولى ... 7 8 9 10 1112 13 14 الأخيرةالأخيرة
النتائج 101 إلى 110 من 137
  1. [101]
    إكرامي سيد أحمد
    إكرامي سيد أحمد غير متواجد حالياً
    عضو فعال


    تاريخ التسجيل: Nov 2005
    المشاركات: 58
    Thumbs Up
    Received: 0
    Given: 0
    يا ريت مشروع الانفاق للاستفاده

    0 Not allowed!



  2. [102]
    إكرامي سيد أحمد
    إكرامي سيد أحمد غير متواجد حالياً
    عضو فعال


    تاريخ التسجيل: Nov 2005
    المشاركات: 58
    Thumbs Up
    Received: 0
    Given: 0
    ومشاريع الري والصرف يا ريت برده

    0 Not allowed!



  3. [103]
    رزق حجاوي
    رزق حجاوي موجود حالياً

    إستشاري الهندسة المدنية


    الصورة الرمزية رزق حجاوي


    تاريخ التسجيل: Mar 2008
    المشاركات: 7,649
    Thumbs Up
    Received: 4,987
    Given: 1,442
    I worked in many civil project like:-

    1. Sundays Resort – Hotel & Aqua Park – Dead Sea – Jordan

    The project consists of a mixed-use Hotel Five Stars and Aqua Park.
    The work consist of infrastructure, Hotel .Restaurant, Entrance Building, Games Hall, Sewage Treatment Plant ,Filtration Plant, Parking Building, Land cape Area, Tanks, Lazy River, Wave Pools and Swimming Pools, Foundations on Gravel Compacted Piles.
    The total area of the project of 20,000 m2 .
    Cost of First Stage: 30 Million US$ – Three Contract Packages.

    2. HALUL HARBOUR UPGRADE PHASE II – Halul - Qatar
    The Jetty is located in Halul Island of Qatar in Arab Gulf.
    The work comprises the construction of a jetty 150 m long. The works include earthwork, backfilling of quarry run ,retaining wall from steel sheet piles, Pre-cast shells of beams and slabs, protection layer from rock and core-loc blocks , suspended slabs and tubular steel piles.
    The contract values for the project 25 million US$.

    3. Bairro Sonangol, Luanda Sul – ZR1. Luanda – Angola
    The project consists of a mixed-use community known as Bairro Sonangol, Luanda Sul – ZR1.
    The work consists of infrastructure, treatment plant, a commercial center containing schools, retail market, medical clinic, and recreational facilities, maintenance facilities and a residential area containing 214villas (Total area of the houses 82148 m2) single family residences, the project in final consist 450 villas.
    The contract values for the project for this stage 112.5 million US$.


    4. Repair to Container and RO-RO – Aqaba – Jordan.
    The scope of repairs covered the following Jetty elements: Front Cope Face, Pre-Cast Beams, Pile Muffs, Barrage Dolphin Suspended Slabs of about 18000 m2 including breakout of concrete surface to a min. depth of 20 cm, assessment, sand blast and epoxy coat the reinforcement steel and special Mix Design of Fluid Concrete and Shot- Crete.
    The repairs included all vertical sides, soffit of edges & Cope beams.
    Support works, forming & concreting within the splash zone.
    Refurbishment of the Jetty accessories including rubber fenders, timber fenders, safety ladders, bollards…etc.
    Cost: 4 Million US$ – One Contract Package.

    5. Tannur Dam –Jordan.
    The dam is located in Wadi Al-Hasa-South of Karak and North of Tafila in the H.K.J.

    The work comprises the construction of a dam 69-meter high retaining a reservoir of 16.9million cubic meter capacity. The works include earthworks, a roller compacted concrete dam (RCC) with integral stepped spillway, and drainage gallery with access shafts, access roads, electromechanical works related to the dam and building for resident staff.
    Cost: 31 Million US$ – One Contract Package.

    [FONT='Times New Roman','serif']6. [/font]Repair to the Industrial Jetty – Aqaba – Jordan.[FONT='Times New Roman','serif']
    The scope of repairs covered the following Jetty elements: Deck slab of about 7500 m2 including breakout of concrete surface to a min. depth of 20 cm, assessment, sand blast and epoxy coat the reinforcement steel, concreting and applying protective surface coating (Nito Prime Zinc rich).
    The repairs included all vertical sides, soffit of edges & Cope beams. [/font]
    The structural repairs of Barrage dolphins (6 nos.) including min. 20 cm breakout of top, and soffit concrete, replacement of reinforcement steel, support works, forming & concreting within the splash zone. Special mix designs used for repair materials.
    Refurbishment of the Jetty accessories including rubber fenders, timber fenders, safety ladders, bollards…etc.
    Cost: 2.0 Million US$ – One Contract Package.

    7. Greater Aden Water Supply, Project 2nd Stage, Yemen.
    •Two Elevated Steel Tanks (28m height with capacity of 1000m3 & 17 m height with capacity of 2000 m3).
    •Transmission and Distribution Pipes (Ductile and Asbestos) for water with 2.3-km length.
    Cost: 4.8 million US$.

    8. National Poultry Slaughterhouse, Qatraneh-Karak, Jordan.
    •Steel Structure Hangers; 18000m2, Built Area including Blast Tunnels & Deep Freezers, Cap. Of 3000m3 (3500 Ton).
    •Treatment Plant with a capacity of 800m3/day, which included five reinforced concrete circular tanks with a diameter range of (8.5m-42.0m) And total volume of 14000m3.
    •External Works: Asphalt Roads & Yards: Area of 14000m2.
    •Infrastructure woks: Storm water and sanitary drainage system and Electric cables.
    Cost: 22 million US$, 6 Contract Packages.

    Project No.1: Gymnasium Sport Project (Al-Hussein Sport Gm.) Applied Sciences University Amman-Jordan.
    A steel structure project (70 x 80m) and the main frame span 70m.The project included: -Stadium of a capacity of 6000 audiences Yards for Basketball, Volleyball, Squash Court and Halls for Lectures. In addition to the civil works, the Electro-mechanical works were included and Infrastructure Services: Storm water and sanitary drainage system and electric cables. The total area for the project was 11500 m2.
    Project No. 2: Library and Laboratories Buildings- Applied Sciences University.
    Those buildings are multi-storey steel structure with a total area 12000m2. They included a main Library Hall in addition to Labs-halls and Ten Lecture halls with its supplementary need. The slabs were composite structure of deck slab with concrete topping.
    Project No. 3: Iben Al-Haithem Hospital- Amman-Jordan.
    The total area of the project was 6000m2; the project capacity was of 68 beds, five surgical rooms, laboratory sections, x-ray section. C.T. scanner and M.R.I. sections. Also it included a kitchen and laundry, in addition to decoration and Infrastructure Services: Storm water and sanitary drainage system and electric cables.


    9. Project No. 1: School Project \Ministry of Education- Jordan.
    The total area of 5300 m2. The project covered the infrastructure services, and external works with the boundary walls.
    Project No. 2: Gas Turbine at Al-Risha-Jordan.
    The project was a joint venture between Haddadin Co. and Montaji Co. (Bulgarian Co.). The project consisted of Concrete Turbine base with a capacity of 40 M Watt, Transformer base, Cable lines, Natural Gas purification base, Electricity transfer tower and fuel steel tank with a capacity of 3000m3.
    Consultant: American “General – Electric Co.”
    Designer: HITACHI (JAPAN) Co.
    Cost Project: 1&2: 1 million US$& 6 million US$, 2 Contract Packages.

    10. Project No. 1: Sheep Improvement Project, Mafraq- Jordan.
    Sheep improvement project was a comprehensive and complete project for improving; raising sheep, cheese and yogurt manufacturing, the project consists of the following sections: -
    a) Administrations store and vet building with area of 1500 m2.
    b) Five hangers, Silos, Water tanks, with a total area of 8000m2.
    c) Agricultural system includes open pool with a capacity of water 4500 m3, Sprinklers irrigation system with pumps and water Lines, the area covered 25000m2 of land.
    d) Factory of yogurt and cheese.
    Project No. 2: Boys School Project -Ministry of Education.
    The total area of 2400 m2. The project covered the infrastructure services, and external works with the boundary walls.
    Project No. 3: Boys School Project \Ministry of Education.
    The total area of 5300 m2. The project covered the infrastructure services, and external works with the boundary walls.
    Cost Project: 9 million US$.

    Next time I can explain every project with some drawing and pictures.

    0 Not allowed!



  4. [104]
    مصطفى السعيد
    مصطفى السعيد غير متواجد حالياً
    جديد


    تاريخ التسجيل: Jul 2006
    المشاركات: 2
    Thumbs Up
    Received: 0
    Given: 0
    شكرا على هذه المخططات القيمة

    0 Not allowed!



  5. [105]
    ahmed_civil
    ahmed_civil غير متواجد حالياً
    عضو متميز
    الصورة الرمزية ahmed_civil


    تاريخ التسجيل: Apr 2006
    المشاركات: 505
    Thumbs Up
    Received: 7
    Given: 0
    مواضيع مفيدة

    0 Not allowed!



  6. [106]
    ahmed_civil
    ahmed_civil غير متواجد حالياً
    عضو متميز
    الصورة الرمزية ahmed_civil


    تاريخ التسجيل: Apr 2006
    المشاركات: 505
    Thumbs Up
    Received: 7
    Given: 0
    و شكرا على المجهوود الرائع

    0 Not allowed!



  7. [107]
    ابومحمد صالح
    ابومحمد صالح غير متواجد حالياً
    عضو فعال


    تاريخ التسجيل: Mar 2008
    المشاركات: 85
    Thumbs Up
    Received: 1
    Given: 0
    انا مراقب انشاءات واشرفت على تقريباً 12 مشروع
    نموذج مدارس ولعل من ابرز العقبات التى تواجه المهندس المشرف اوالمراقب المشرف التخطيط المبدئي للمشروع ومنها على سبيل المثال التشوين البرنامج الزمني بعض التعديلات التي تحتاج الى دراسة في المحاور الاعمدة الكمرات الارتفاعات ووووو يوجد لدي صور لاكن لا اعف بالضبط ارسالها وفي حالة الدراسة لارسال الصور سوف ارسلها انشاء الله

    0 Not allowed!



  8. [108]
    طيف الحارث
    طيف الحارث غير متواجد حالياً
    جديد


    تاريخ التسجيل: Dec 2007
    المشاركات: 6
    Thumbs Up
    Received: 0
    Given: 0
    السلام عليكم
    ممكن تفيدونني بمخططات عن التكييف المركزي او موقع عربي اجد فية مثل هذة المخططات

    0 Not allowed!



  9. [109]
    mohamed elamir
    mohamed elamir غير متواجد حالياً
    عضو فعال


    تاريخ التسجيل: Apr 2007
    المشاركات: 140
    Thumbs Up
    Received: 2
    Given: 0
    هل هناك مساجد جديدة تقوم بتنفيذها الأن أرجو إرسال البينات الخاصة بك ولك مني جزيل الشكر
    moh_elamir***********

    0 Not allowed!



  10. [110]
    مصطفى المطني
    مصطفى المطني غير متواجد حالياً
    عضو فعال


    تاريخ التسجيل: Mar 2008
    المشاركات: 96
    Thumbs Up
    Received: 2
    Given: 0
    بسم الله الرحمن الرحيم
    المهندسة سميرة عبدالله اختصاص مدني
    لقد وفقني الله لعمل برنامج عربي يقوم بتوزيع الهوردي على المسقط بسرعة وسهولة ويحسب بنفس الوقت عدد البلوكات وحجم البيتون الصافي كما يساعد في تحديد السماكة الاولية للبلاطة وفق اشتراطات الكود السوري كما ويساعد في اختيار البلوكة المناسبة بالتفاعل مع برنامج الاوتوكاد

    0 Not allowed!



  
صفحة 11 من 14 الأولىالأولى ... 7 8 9 10 1112 13 14 الأخيرةالأخيرة
الكلمات الدلالية لهذا الموضوع

عرض سحابة الكلمة الدلالية

RSS RSS 2.0 XML MAP HTML