دورات هندسية

 

 

مراحل تنفيذ خزان عالي

صفحة 10 من 10 الأولىالأولى ... 6 7 8 9 10
النتائج 91 إلى 99 من 99
  1. [91]
    mohy_y2003
    mohy_y2003 غير متواجد حالياً

    مشرف سابق وإستشاري الهندسة المدنية


    الصورة الرمزية mohy_y2003


    تاريخ التسجيل: Jun 2007
    المشاركات: 9,636
    Thumbs Up
    Received: 350
    Given: 439
    مشكور اخي الفاضل ابو بكر وجزاك الله خيرا

    0 Not allowed!



  2. [92]
    ابو خضير الجديد
    ابو خضير الجديد غير متواجد حالياً
    جديد


    تاريخ التسجيل: Feb 2008
    المشاركات: 1
    Thumbs Up
    Received: 0
    Given: 0
    قمت بتفيذ خزان عالى سعة 1000م3 بارتفاع الحلة 30 متر من سطح الارض بنظام الاعمدة والمرات

    0 Not allowed!



  3. [93]
    طلعت محمد علي
    طلعت محمد علي غير متواجد حالياً

    إستشاري الهندسة المدنية




    تاريخ التسجيل: Mar 2007
    المشاركات: 1,759
    Thumbs Up
    Received: 1,234
    Given: 1,727
    بارك الله فيك اخى العزيز م / ابو بكر

    وجعله الله فى ميزان حسناتك.

    فدائما ما اتحفتنا بمواضيعك المثمره والمفيده... الى الامام دائما باذن الله.

    0 Not allowed!



  4. [94]
    azeez3500
    azeez3500 غير متواجد حالياً
    عضو فعال


    تاريخ التسجيل: Jun 2006
    المشاركات: 121
    Thumbs Up
    Received: 0
    Given: 0
    بسم الله الرحمن الرحيم

    جزاك الله كل خير

    0 Not allowed!



  5. [95]
    علي احمد محمد
    علي احمد محمد غير متواجد حالياً
    عضو فعال جداً
    الصورة الرمزية علي احمد محمد


    تاريخ التسجيل: Nov 2005
    المشاركات: 215
    Thumbs Up
    Received: 1
    Given: 0
    بارك الله فيكم على العمل

    0 Not allowed!



  6. [96]
    رزق حجاوي
    رزق حجاوي غير متواجد حالياً

    إستشاري الهندسة المدنية


    الصورة الرمزية رزق حجاوي


    تاريخ التسجيل: Mar 2008
    المشاركات: 7,648
    Thumbs Up
    Received: 4,985
    Given: 1,442

    Lifting Roof Tank

    This example for lifting Steel Roof Tank

    Introduction
    In the vicinity of St. Nazaire at the mouth of the Loire, a transit plant for liquefied natural gas was built from 1977 to 1979. This plant contains also two LNG tanks, each of 120 000 m3 capacity. A further LNG tank of the same size was added in 1980
    Details of the structures
    The tanks are of concrete, which is internally insulated with PVC panels and sealed with steel. Each tank has an external diameter of 64.90 m and a height (from the base slab to the highest point of the dome) of 51.93 m. The 1000 mm thick bottom slab rests 2 m above the ground, so that it can be well ventilated below. It stands on 113 square columns, which are carried on piles of elongated
    Cross-section, 35 to 40 m in length. The thickness of the wall is 900 mm, that of the dome (radius 60 m) is 600 mm. The bottom slab has external hoop post-tensioning, the wall contains post-tensioning cables in the horizontal and vertical directions. The connections between wall and bottom slab and wall and dome are monolithic ).
    Construction procedure
    After completion of the foundation and the bottom slab, the wall was constructed by slip forming. This method was preferred to climbing formwork, on account of its better guarantee of tightness. In addition, it was possible to use the formwork
    twice, which offered economic advantages. The concrete dome was erected on the steel dome which served as seal and formwork skin.
    Lifting
    After the wall had been built, the steel dome was assembled on the base slab. This dome contains stiffeners, some of which were of a temporary nature. After the dome had been completed it was lifted as a unit into its final position. In the lifting state its weight was 600 tones. For the lift, 12 lifting frames of steel were erected on the upper edge of the tank wall. Each of these brackets was fitted with a VSL motive unit SLU-70, cable comprising 7 strands Ø 15 mm ran. The lifting distance was 32 m. The dome was raised to 100 mm above the bearing plane, and was then fitted with the ends of the beams, which came to rest on the bearings when the dome was set down.
    The first dome was lifted in June and the second in July 1978

    م. رزق حجاوي

    0 Not allowed!



  7. [97]
    باسل عباس
    باسل عباس غير متواجد حالياً
    عضو


    تاريخ التسجيل: May 2008
    المشاركات: 16
    Thumbs Up
    Received: 0
    Given: 0
    بارك الله فيك على الموضوع

    0 Not allowed!



  8. [98]
    عبده الشمري
    عبده الشمري غير متواجد حالياً
    عضو
    الصورة الرمزية عبده الشمري


    تاريخ التسجيل: Oct 2007
    المشاركات: 19
    Thumbs Up
    Received: 0
    Given: 0

    Thumbs down الله

    الله يجازيك عني خيرا

    0 Not allowed!



  9. [99]
    م.نضال عبد الله
    م.نضال عبد الله غير متواجد حالياً
    عضو


    تاريخ التسجيل: Jun 2008
    المشاركات: 20
    Thumbs Up
    Received: 0
    Given: 0
    م.نضال عبد اااه جزاك الله خيرا ولكن يا حبذا يا حبذا لو تم ارفاق الصور بشكل منفصل بحيث نستطيع تكبيرها ومعاينة ما خفى عنا فى حجمها الصغير .. ويا حبذا لو كانت هناك صورة لتسليح حلة الخزان وطريقة تحميل البلاطة على الاعمدة ..( ولا كده بنتقل عليك ) .... جعل الله هذا الخزان فى ميزان حسناتك .. امين