دورات هندسية

 

 

Api 510 course-دورة هامة عن api 510

صفحة 1 من 6 12 3 4 5 ... الأخيرةالأخيرة
النتائج 1 إلى 10 من 55
  1. [1]
    الصورة الرمزية سيد صلاح الصاوى
    سيد صلاح الصاوى
    سيد صلاح الصاوى غير متواجد حالياً

    مشرف متميز

      وسام مشرف متميز


    تاريخ التسجيل: Aug 2008
    المشاركات: 826
    Thumbs Up
    Received: 62
    Given: 43

    Api 510 course-دورة هامة عن api 510




    Final Role Delineation & Rubrics (******* classification)

    Pressure Vessel Inspector Certification (API-510)

    Activity areas (Domains)
    Task Statements
    Knowledge statements




    Activity 01 -- Planning and Extent of Inspections - 510

    Tasks:
    0101 Review previous pressure vessel inspection reports
    0102 Identify areas of special concern (e.g., blinded nozzles, bottom of ring joint grooves)
    0103 Determine and document any changes in service conditions (e.g., temperature, pressure)
    0104 Determine number and placement of thickness measurement locations on pressure vessels
    0105 Plan the pressure vessel inspection as regards types of deterioration (e.g., corrosion, stress cracking, CUI, embrittlement, erosion, wet H2S, hydrogen creep)
    0106 Plan the pressure vessel inspection as regards inspection techniques (e.g., NDE, impact testing)
    0107 Identify refractory concerns
    0108 Determine inspection requirements (e.g., jurisdictional, code applicability)

    Knowledge of:
    01 ..responsibilities of involved parties
    02 ..major types of corrosion/deterioration mechanisms and where they are likely to occur
    03 ..areas of special concern as regards deterioration
    04 ..applications/limitations of various inspection techniques
    05 ..special considerations due to service (e.g., wet H2S, Hydrogen creep, temperature, stress cracking)
    06 ..testing requirements
    07 ..types of refractory and inspection methods
    08 ..record keeping systems and requirements (e.g., including manual and computer-based)
    09 ..scope of API 510, Pressure Vessel Inspection Code
    10 ..drafting conventions


    Activity 02 -- Inspection and Testing Practices - 510

    Tasks:
    0201 Assess potential safety hazards associated with conducting inspection & follow all required safety permits, procedures, & provisions for proper personal protective equipment
    0202 Ensure all NDE equipment is properly maintained and calibrated
    0203 Conduct external inspection
    0204 Conduct necessary NDE inspection (including flaw detection and sizing)
    0205 Ensure that inspection and data collection is done in accordance with approved procedures
    0206 Conduct thickness measurements
    0207 Conduct internal inspection
    0208 Inspect for corrosion under insulation (CUI)
    0209 Conduct inspection of refractory system
    0210 Specify and witness pressure and leak tests
    0211 Specify and oversee necessary destructive inspection
    0212 Conduct inspection of insulation systems
    0213 Inspect nozzles (including reinforcement)
    0214 Inspect pressure relieving device(s)

    Knowledge of:
    12 ..safety requirements for inspection (e.g., Permit Required Confined Spaces, Lockout/Tagout, elevated work)
    13 ..personnel qualification for NDE per ASNT SNT-TC-1A
    14 ..NDE procedures per ASME Boiler and Pressure Vessel Code, Section V
    15 ..insulation and insulation inspection methods (including CUI)
    16 ..refractory systems and inspection methods
    17 ..leak and pressure testing procedures, requirements, and precautions
    18 ..cleanliness requirements for inspection
    19 ..maintenance and calibration requirements and methods for various inspection equipment
    20 ..applications/limitations of various inspection techniques (e.g., hammer testing, strapping, PT, RT)
    21 ..paint, coating, and corrosion-resistant lining/cladding systems
    22 ..cathodic protection systems
    23 ..requirements for non-destructive examination
    24 ..requirements for destructive examination
    25 ..IRE, Chapter II (API RP 571), Conditions Causing Deterioration or Failures
    26 ..API RP 576, Inspection of Pressure-Relieving Devices
    27 ..requirements for relief device set pressures
    28 ..methods for defect location and sizing
    29 ..sensitizing agents for alloy material (e.g., chlorides on austenitic stainless steels)

    Activity 03 -- Data Evaluation and Documentation - 510

    Tasks:
    0301 Determine minimum allowable thickness of shell, heads, and nozzles
    0302 Determine maximum allowable working pressure
    0303 Record inspection data
    0304 Evaluate locally thinned areas or other indications (e.g., undercut, slag inclusion, porosity) in regard to need for repair or replacement
    0305 Calculate corrosion rates on equipment
    0306 Evaluate change of service effects on inspection frequency and suitability of continued service
    0307 Determine estimated remaining life
    0308 Adjust the number and location of thickness measurement locations based on inspection results and deterioration mechanisms
    0309 Document the evaluation in a record system
    0310 Schedule the next inspection based upon frequency requirements and estimated remaining life
    0311 Evaluate nozzle reinforcement

    Knowledge of:
    30 ..corrosion rate calculation
    31 ..remaining life calculation
    32 ..establishing inspection frequency based on remaining life and service
    33 ..maximum service intervals specified by codes and standards
    34 ..Thickness Measurements Locations and their selection
    35 ..requirements for documentation of results
    36 ..deterioration mechanisms and their impact on suitability of continued service
    37 ..maximum allowable working pressure (MAWP) calculations
    38 ..minimum allowable thickness calculations
    39 ..evaluation criteria of locally thinned areas
    40 ..evaluation criteria for widely scattered pits
    41 ..established inspection frequency for pressure vessels


    Activity 04 -- Repairs, Alterations, and Rerating - 510

    Tasks:
    0401 Specify repairs and alteration work prior to commencement of work including identification of inspection hold points
    0402 Verify correct materials used in repairs and alterations
    0403 Ensure that all work complies with approved procedures and standards
    0404 Ensure that a pressure vessel engineer has been consulted when appropriate
    0405 Approve all repairs, rerating, and alterations when complete
    0406 Document repairs, alterations, and rerating

    Knowledge of:
    44 ..procedures to evaluate competency of repair organization
    45 ..ASME Boiler and Pressure Vessel Code, Section II
    46 ..ASME Boiler and Pressure Vessel Code, Section VIII Division I
    47 ..material requirements and methods for positive material identification
    48 ..inspection, testing, and documentation requirements
    49 ..definitions of repairs and alterations
    50 ..repairs and alteration methods and procedures
    51 ..hot tapping techniques and requirements
    52 ..rerating requirements and calculations
    53 ..fabrication techniques

    Activity 05 -- Welding - 510

    Tasks:
    0501 Approve welding procedure specifications (WPS) and Procedure Qualification Records (PQR) to assure compliance with applicable code
    0502 Verify welders’ qualifications
    0503 Ensure welding is performed according to approved procedure (including pre-heat)
    0504 Ensure correct filler metals are used and properly stored
    0505 Ensure PWHT is performed according to procedure
    0506 Ensure that alternatives to PWHT (e.g., temper-bead) conform to applicable code

    Knowledge of:
    55 ..ASME Boiler and Pressure Vessel Code, Section IX-Welding and Brazing Qualifications
    56 ..impact testing requirements
    57 ..WPS, PQR, and WPQ requirements
    58 ..preheat requirements for various materials, thicknesses, and conditions
    59 ..acceptable methods and temperatures, and precautions for PWHT
    60 ..acceptable alternative methods to PWHT
    61 ..methods of documenting welds (e.g., welders’ stamps, weld maps)
    62 ..requirements for welding conducted on pressure vessels in operation (e.g., hot tapping)

    خاص للمهندس محمد عبيد عمر
    و جميع مهندسى ملتقى المهندسين العرب
    SEE ATTACHED LINK

    http://www.4shared.com/file/11339718...10_Course.html



  2. [2]
    سيد صلاح الصاوى
    سيد صلاح الصاوى غير متواجد حالياً
    مشرف متميز
    الصورة الرمزية سيد صلاح الصاوى


    تاريخ التسجيل: Aug 2008
    المشاركات: 826

    وسام مشرف متميز

    Thumbs Up
    Received: 62
    Given: 43

    Api 510-introduction

    Api 510-introduction
    see attached file

    0 Not allowed!


    الملفات المرفقة
    م/سيد احمد صلاح الصاوى

  3. [3]
    سيد صلاح الصاوى
    سيد صلاح الصاوى غير متواجد حالياً
    مشرف متميز
    الصورة الرمزية سيد صلاح الصاوى


    تاريخ التسجيل: Aug 2008
    المشاركات: 826

    وسام مشرف متميز

    Thumbs Up
    Received: 62
    Given: 43

    Api 5i0-lesson 1

    Api 5i0-lesson 1
    see attached file

    0 Not allowed!


    الملفات المرفقة
    م/سيد احمد صلاح الصاوى

  4. [4]
    سيد صلاح الصاوى
    سيد صلاح الصاوى غير متواجد حالياً
    مشرف متميز
    الصورة الرمزية سيد صلاح الصاوى


    تاريخ التسجيل: Aug 2008
    المشاركات: 826

    وسام مشرف متميز

    Thumbs Up
    Received: 62
    Given: 43

    Api 5i0-lesson 2

    Api 5i0-lesson 2
    see attached file

    0 Not allowed!


    الملفات المرفقة
    م/سيد احمد صلاح الصاوى

  5. [5]
    سيد صلاح الصاوى
    سيد صلاح الصاوى غير متواجد حالياً
    مشرف متميز
    الصورة الرمزية سيد صلاح الصاوى


    تاريخ التسجيل: Aug 2008
    المشاركات: 826

    وسام مشرف متميز

    Thumbs Up
    Received: 62
    Given: 43

    Api 5i0-lesson 3

    Api 5i0-lesson 3
    see attached file

    0 Not allowed!


    الملفات المرفقة
    م/سيد احمد صلاح الصاوى

  6. [6]
    سيد صلاح الصاوى
    سيد صلاح الصاوى غير متواجد حالياً
    مشرف متميز
    الصورة الرمزية سيد صلاح الصاوى


    تاريخ التسجيل: Aug 2008
    المشاركات: 826

    وسام مشرف متميز

    Thumbs Up
    Received: 62
    Given: 43

    Api 5i0-lesson 4

    Api 5i0-lesson 4
    see attached file

    0 Not allowed!


    الملفات المرفقة
    م/سيد احمد صلاح الصاوى

  7. [7]
    سيد صلاح الصاوى
    سيد صلاح الصاوى غير متواجد حالياً
    مشرف متميز
    الصورة الرمزية سيد صلاح الصاوى


    تاريخ التسجيل: Aug 2008
    المشاركات: 826

    وسام مشرف متميز

    Thumbs Up
    Received: 62
    Given: 43

    Api 5i0-lesson 5

    Api 5i0-lesson 5
    see attached file

    0 Not allowed!


    الملفات المرفقة
    م/سيد احمد صلاح الصاوى

  8. [8]
    سيد صلاح الصاوى
    سيد صلاح الصاوى غير متواجد حالياً
    مشرف متميز
    الصورة الرمزية سيد صلاح الصاوى


    تاريخ التسجيل: Aug 2008
    المشاركات: 826

    وسام مشرف متميز

    Thumbs Up
    Received: 62
    Given: 43

    Api 5i0-lesson 6

    Api 5i0-lesson 6
    see attached file

    0 Not allowed!


    الملفات المرفقة
    م/سيد احمد صلاح الصاوى

  9. [9]
    سيد صلاح الصاوى
    سيد صلاح الصاوى غير متواجد حالياً
    مشرف متميز
    الصورة الرمزية سيد صلاح الصاوى


    تاريخ التسجيل: Aug 2008
    المشاركات: 826

    وسام مشرف متميز

    Thumbs Up
    Received: 62
    Given: 43

    Api 5i0-lesson 7

    Api 5i0-lesson 7
    see attached file

    0 Not allowed!


    الملفات المرفقة
    م/سيد احمد صلاح الصاوى

  10. [10]
    سيد صلاح الصاوى
    سيد صلاح الصاوى غير متواجد حالياً
    مشرف متميز
    الصورة الرمزية سيد صلاح الصاوى


    تاريخ التسجيل: Aug 2008
    المشاركات: 826

    وسام مشرف متميز

    Thumbs Up
    Received: 62
    Given: 43

    Api 5i0-lesson 8

    Api 5i0-lesson 8
    see attached file

    0 Not allowed!


    الملفات المرفقة
    م/سيد احمد صلاح الصاوى

  
صفحة 1 من 6 12 3 4 5 ... الأخيرةالأخيرة
الكلمات الدلالية لهذا الموضوع

عرض سحابة الكلمة الدلالية

RSS RSS 2.0 XML MAP HTML