Engineering Responsibilities The normal procedure in a design-bid project includes the following steps and requirements: 1. Initiation of a construction project by owner or developer 2. Selection of design team 3. Setting of the design criteria and indoor environmental parameters 4. Selection of conceptual alternatives for systems and subsystems; preparation of schematic layouts of HVAC&R 5. Preparation of contract documents, working drawings, specifications, materials and construction methods, commissioning guidelines 6. Competitive bidding by contractors 7. Evaluation of bids; negotiations and modification of contract documents 8. Advice on awarding of contract 9. Review of shop drawings and commissioning schedule, operating and maintenance manuals 10. Monitoring, supervision, and inspection of construction 11. Supervision of commissioning: testing and balancing; functional performance tests 12. Modification of drawings to the as-built condition and the finalization of the operation and maintenance manual
__________________
![]() ![]() ![]() التعديل الأخير تم بواسطة م.محمد عبد الفتاح سيد ; 11-03-2008 الساعة 07:29 PM. |
|
||||
|
13. Acceptance Construction work starts at contract award following the bidding and negotiating and ends at the acceptance of the project after commissioning. It is necessary for the designer to select among the available alternatives for optimum comfort, economics, energy conservation, noise, safety, flexibility, reliability, convenience, and maintainability. Experience, education, and judgment all enter into the selection process. If both a complicated system and a simple system yield the same performance, the simple system is preferred for its reliability, operator convenience, and lower cost. Coordination between Air Conditioning and Other Trades, Teamwork Air conditioning, plumbing, and fire protection systems are mechanical systems in a building. Both mechanical and electrical systems provide building services for the occupants and goods inside the building. Coordination between the mechanical engineer for HVAC&R and the architect, as well as between mechanical and structural or electrical engineers, or teamwork, becomes important.
__________________
![]() ![]() ![]() |
|
|||
|
الأخ الفاضل/ مهندس / محمد عبد الفتاح
الحمد لله الذي أنعم علينا برجال قلما وجدوا ، أكثر الله من أمثالك وأزادك من علمه أعتقد أن هذا الموضوع متكامل مع موضوعي ، وأشجعك علي إعطاء المزيد . وسوف أتابعك بكل شغف. |
|
|||
|
Dear All,
Please I need your urgent support: I m doing the master degree study and my graduation project in the air Conditioning field (Visibility Study of refrigeration compressor (Selection &comparison) to be used in Dusty and hot conditions. I need your support in all ways presentations, information, references or any kind of advice. |
![]() |