مطلوب مهندسين شبكات وفنيين


 

صفحة 88 من 864 الأولىالأولى ... 387884 85 86 87 8889 90 91 92 98138188588 ... الأخيرةالأخيرة
النتائج 871 إلى 880 من 8635
  1. [871]
    عضو متميز
    الصورة الرمزية saqure


    تاريخ التسجيل: Apr 2007
    المشاركات: 153
    Thumbs Up
    Received: 0
    Given: 0

    Post

    اقتباس المشاركة الأصلية كتبت بواسطة احسان فاضل عباس مشاهدة المشاركة
    الاسلام عليكم
    شكرا لكم على هذه المساعدة وتوفير الوقت جزاءكم الله خير جزاء
    احتاج الى هذه البحوث:
    1.science direct, applied thermal engineering , v.26,issue 7, may 2006,pp.772-775
    sub: Numerical study of the natural covection in cavity heated from the lower corner and cooled from ceiling
    Auth: K.Ben Nasr, R. Chouikh, C. Kerkeni, and A. Guizani
    2. science direct, Energy and Building , v.37,issue 7, July 2005pp.691-697
    Sub.: Double Skin faced's effects on heat losses of office buildings in Istambul
    Auth.: Zerrin yilmas, and Ferit Cetintas
    3. Science Direct , Mechatronics, v.13,issue 4 may 2203, pp.331-351
    Sub.: Simulated and experimental study of hydralic anti-lock braking system using sliding mode PWN control
    Auth.: Ming - Chin Wu and Ming - Chang Shih
    4.IEEE , V., Issue, 11-14, Dec.1996,pp.67-72

    Fuzzy Control for the Anti - lock brak system
    Auth.: Chin-heng Chen , Yu- Chi Wang
    مع الشكر
    وعليكم السلام ورحمة الله
    وجدت أول بحثين فقط...إذا أرسلت روابط البحثين الآخرين لربما أستطعت أن أوفرهما....
    تفقد المرفقات...

    0 Not allowed!


    طلبات الأوراق العلمية و الأبحاث ... Scientific papers Requests here الملفات المرفقة

  2. [872]
    عضو تحرير المجلة
    الصورة الرمزية aalmasri


    تاريخ التسجيل: Jun 2006
    المشاركات: 2,016
    Thumbs Up
    Received: 8
    Given: 0
    اقتباس المشاركة الأصلية كتبت بواسطة smi مشاهدة المشاركة
    plz help me to get the next



    1. K. KARIM, M, MAROSSZEKY: Enterprise process monitoring using key performance indicators. In R. Best, and G. deValence (Eds.) Design and Construction: Building and Value (pp. 276-290). Butterworth-Heinemann, Boston, 2002.

    2. V. CHRYSOSTOMOU: Key Performance Indicators and Benchmarking for the Housing Sector. Construction Benchmarking Centre, Bristol, 2000.

    3. E. SKOGSTAD: Using Benchmarking Metrics to Uncover Best Practices. American Productivity & Quality Center (APQC), Houston, 2003. Downloaded on 2 September 2005 from



    30. Construction 21: Re-inventing construction. Ministry of Manpower and Ministry of National Development, Singapore, 1999.
    31. L. ARCON, A. GRILLO, J. FREIRE, and S. DIETHELM: Learning from Collaborative Benchmarking in the Construction Industry. National University of Singapore, Singapore, 2001
    أرجو وضع طلبات الابحاث فقط هنا, اما طلبات الكتب فيمكن وضعها في موضوع طلبات الكتب

    0 Not allowed!


    (رب إني لما أنزلت إلي من خير فقير)


  3. [873]
    عضو فعال
    الصورة الرمزية smi


    تاريخ التسجيل: May 2007
    المشاركات: 131
    Thumbs Up
    Received: 0
    Given: 0
    ok sir ; but plz help me to get the next



    1. K. KARIM, M, MAROSSZEKY: Enterprise process monitoring using key performance indicators. In R. Best, and G. deValence (Eds.) Design and Construction: Building and Value (pp. 276-290). Butterworth-Heinemann, Boston, 2002.


    4. R. COX, R. ISSA, and D. AHRENS: Management's perception of key performance indicators for construction. Journal of Construction Engineering and Management, Vol. 129, No.2, 2003, pp. 142-151.

    6. M. ZAIRI: Benchmarking: the best tool for measuring competitiveness. Benchmarking for Quality Management and Technology, Vol. 1, No. 1, 1994, pp. 11-24.

    7. D. FISHER, S. MIERTSCHIN, and D. POLLOCK: Benchmarking in construction industry. Journal of Management in Engineering, Vol.11, No.1, 1995, pp. 50-57.

    8. D. ELMUTI, and Y. KATHAWALA: An overview of benchmarking process: a tool for continuous improvement and competitive advantage. Benchmarking for Quality Management and Technology, Vol.4, No.4, 1997, pp. 229-243.

    9. S. BRAH, A.L. ONG, and B.M. RAO: Understanding the benchmarking process in Singapore. International Journal of Quality and Reliability Management, Vol. 17, No.3, 2000, pp. 259-275.


    13. A. COOK: How do you measure up? Building, Vol.264, No. 19, 1999, pp. 24-27.

    14. E. PALANEESWARAN, and M.M. KUMARASWAMY: Benchmarking contractor selection practices in public-sector construction--a proposed model. Engineering, Construction and Architectural Management, Vol. 7, No. 3, 2000, pp. 285-299.


    23. Z. HATUSH, and M. SKITMORE: Criteria for contractor selection. Construction Management and Economics, Vol. 15, No. 1, 1997, pp. 19-38.

    25. R. STRAIGHT: Measuring contractors' performance. Journal of Supply Chain Management, Vol.35, No.2, 1999, pp. 18-28.

    26. H. LINGARD, P. GRAHAM, and G. SMITHERS: Employee perceptions of the solid waste management system operating in a large Australian contracting organization: implications for company policy implementation. Construction Management and Economics, Vol.
    27. M.M.M. TEO, and M. LOOSEMORE: A theory of waste behaviour in the construction industry. Construction Management and Economics, Vol. 19, No. 6, 2001, pp. 741-751.

    .

    29. G. OFORI: Indicators for measuring construction industry development in developing countries. Building Research and Information, Vol. 29, No. 1, 2001, pp. 40-50.

    0 Not allowed!



  4. [874]
    عضو


    تاريخ التسجيل: May 2007
    المشاركات: 16
    Thumbs Up
    Received: 0
    Given: 0
    أحتاج إلى هذه الملفات، لكل من يستطيع مساعدتي
    Please, I need this paper
    SVP, j'ai besoin de cet article

    Fuzzy logic control applied to neonatal life support units
    Crespo, D.; Jimenez, S.; Linares, T.; Chairez, I.; Garcia, A.; Zaragoza, I; Cabrera, A.; Ramirez, A.; Galvez, G.; Gomez, Y.
    Engineering in Medicine and Biology Society, 2000. Proceseedings of the 22nd Annual Inteernational Conference of the IEEE
    Volume 4, Issue, 2000 Page(s) : 2604 - 2607 Vol. 4

    0 Not allowed!



  5. [875]
    عضو


    تاريخ التسجيل: May 2007
    المشاركات: 16
    Thumbs Up
    Received: 0
    Given: 0
    السلام عليكم
    من فضلك أريد هذا البحث :
    Fuzzy logic control applied to neonatal life support units
    Crespo, D.; Jimenez, S.; Linares, R.; Chairez, I.; Garcia, A.; Zaragoza, I.; Cabrera, A.; Perez, A.; Ramirez, A.; Galvez, G.; Gomez, Y.
    Engineering in Medicine and Biology Society, 2000. Proceedings of the 22nd Annual International Conference of the IEEE
    Volume 4, Issue , 2000 Page(s):2604 - 2607 vol.4
    Digital Object Identifier 10.1109/IEMBS.2000.901392

    و جزاكم الله خيرا

    0 Not allowed!



  6. [876]
    عضو فعال
    الصورة الرمزية smi


    تاريخ التسجيل: May 2007
    المشاركات: 131
    Thumbs Up
    Received: 0
    Given: 0
    plz help me to get the next



    1. K. KARIM, M, MAROSSZEKY: Enterprise process monitoring using key performance indicators. In R. Best, and G. deValence (Eds.) Design and Construction: Building and Value (pp. 276-290). Butterworth-Heinemann, Boston, 2002.


    4. R. COX, R. ISSA, and D. AHRENS: Management's perception of key performance indicators for construction. Journal of Construction Engineering and Management, Vol. 129, No.2, 2003, pp. 142-151.

    6. M. ZAIRI: Benchmarking: the best tool for measuring competitiveness. Benchmarking for Quality Management and Technology, Vol. 1, No. 1, 1994, pp. 11-24.

    7. D. FISHER, S. MIERTSCHIN, and D. POLLOCK: Benchmarking in construction industry. Journal of Management in Engineering, Vol.11, No.1, 1995, pp. 50-57.

    8. D. ELMUTI, and Y. KATHAWALA: An overview of benchmarking process: a tool for continuous improvement and competitive advantage. Benchmarking for Quality Management and Technology, Vol.4, No.4, 1997, pp. 229-243.

    9. S. BRAH, A.L. ONG, and B.M. RAO: Understanding the benchmarking process in Singapore. International Journal of Quality and Reliability Management, Vol. 17, No.3, 2000, pp. 259-275.


    13. A. COOK: How do you measure up? Building, Vol.264, No. 19, 1999, pp. 24-27.

    14. E. PALANEESWARAN, and M.M. KUMARASWAMY: Benchmarking contractor selection practices in public-sector construction--a proposed model. Engineering, Construction and Architectural Management, Vol. 7, No. 3, 2000, pp. 285-299.


    23. Z. HATUSH, and M. SKITMORE: Criteria for contractor selection. Construction Management and Economics, Vol. 15, No. 1, 1997, pp. 19-38.

    25. R. STRAIGHT: Measuring contractors' performance. Journal of Supply Chain Management, Vol.35, No.2, 1999, pp. 18-28.

    26. H. LINGARD, P. GRAHAM, and G. SMITHERS: Employee perceptions of the solid waste management system operating in a large Australian contracting organization: implications for company policy implementation. Construction Management and Economics, Vol.
    27. M.M.M. TEO, and M. LOOSEMORE: A theory of waste behaviour in the construction industry. Construction Management and Economics, Vol. 19, No. 6, 2001, pp. 741-751.

    .

    29. G. OFORI: Indicators for measuring construction industry development in developing countries. Building Research and Information, Vol. 29, No. 1, 2001, pp. 40-50.

    0 Not allowed!



  7. [877]
    عضو تحرير المجلة
    الصورة الرمزية aalmasri


    تاريخ التسجيل: Jun 2006
    المشاركات: 2,016
    Thumbs Up
    Received: 8
    Given: 0
    اقتباس المشاركة الأصلية كتبت بواسطة smi مشاهدة المشاركة
    ok sir ; but plz help me to get the next



    1. K. KARIM, M, MAROSSZEKY: Enterprise process monitoring using key performance indicators. In R. Best, and G. deValence (Eds.) Design and Construction: Building and Value (pp. 276-290). Butterworth-Heinemann, Boston, 2002.


    4. R. COX, R. ISSA, and D. AHRENS: Management's perception of key performance indicators for construction. Journal of Construction Engineering and Management, Vol. 129, No.2, 2003, pp. 142-151.

    6. M. ZAIRI: Benchmarking: the best tool for measuring competitiveness. Benchmarking for Quality Management and Technology, Vol. 1, No. 1, 1994, pp. 11-24.

    7. D. FISHER, S. MIERTSCHIN, and D. POLLOCK: Benchmarking in construction industry. Journal of Management in Engineering, Vol.11, No.1, 1995, pp. 50-57.

    8. D. ELMUTI, and Y. KATHAWALA: An overview of benchmarking process: a tool for continuous improvement and competitive advantage. Benchmarking for Quality Management and Technology, Vol.4, No.4, 1997, pp. 229-243.

    9. S. BRAH, A.L. ONG, and B.M. RAO: Understanding the benchmarking process in Singapore. International Journal of Quality and Reliability Management, Vol. 17, No.3, 2000, pp. 259-275.


    13. A. COOK: How do you measure up? Building, Vol.264, No. 19, 1999, pp. 24-27.

    14. E. PALANEESWARAN, and M.M. KUMARASWAMY: Benchmarking contractor selection practices in public-sector construction--a proposed model. Engineering, Construction and Architectural Management, Vol. 7, No. 3, 2000, pp. 285-299.


    23. Z. HATUSH, and M. SKITMORE: Criteria for contractor selection. Construction Management and Economics, Vol. 15, No. 1, 1997, pp. 19-38.

    25. R. STRAIGHT: Measuring contractors' performance. Journal of Supply Chain Management, Vol.35, No.2, 1999, pp. 18-28.

    26. H. LINGARD, P. GRAHAM, and G. SMITHERS: Employee perceptions of the solid waste management system operating in a large Australian contracting organization: implications for company policy implementation. Construction Management and Economics, Vol.
    27. M.M.M. TEO, and M. LOOSEMORE: A theory of waste behaviour in the construction industry. Construction Management and Economics, Vol. 19, No. 6, 2001, pp. 741-751.

    .

    29. G. OFORI: Indicators for measuring construction industry development in developing countries. Building Research and Information, Vol. 29, No. 1, 2001, pp. 40-50.
    وجدت تسعة منها...تفضل

    0 Not allowed!


    طلبات الأوراق العلمية و الأبحاث ... Scientific papers Requests here الملفات المرفقة
    • نوع الملف: zip 004.zip‏ (1.26 ميجابايت, 29 مشاهدات)
    • نوع الملف: zip 008.zip‏ (1.60 ميجابايت, 23 مشاهدات)
    (رب إني لما أنزلت إلي من خير فقير)


  8. [878]
    عضو تحرير المجلة
    الصورة الرمزية aalmasri


    تاريخ التسجيل: Jun 2006
    المشاركات: 2,016
    Thumbs Up
    Received: 8
    Given: 0
    اقتباس المشاركة الأصلية كتبت بواسطة lyso مشاهدة المشاركة
    أحتاج إلى هذه الملفات، لكل من يستطيع مساعدتي
    Please, I need this paper
    SVP, j'ai besoin de cet article

    Fuzzy logic control applied to neonatal life support units
    Crespo, D.; Jimenez, S.; Linares, T.; Chairez, I.; Garcia, A.; Zaragoza, I; Cabrera, A.; Ramirez, A.; Galvez, G.; Gomez, Y.
    Engineering in Medicine and Biology Society, 2000. Proceseedings of the 22nd Annual Inteernational Conference of the IEEE
    Volume 4, Issue, 2000 Page(s) : 2604 - 2607 Vol. 4
    تفضل......

    0 Not allowed!


    طلبات الأوراق العلمية و الأبحاث ... Scientific papers Requests here الملفات المرفقة
    • نوع الملف: pdf 009.pdf‏ (377.1 كيلوبايت, 12 مشاهدات)
    (رب إني لما أنزلت إلي من خير فقير)


  9. [879]
    جديد


    تاريخ التسجيل: Jul 2007
    المشاركات: 1
    Thumbs Up
    Received: 0
    Given: 0
    نحن نشكركم جزيل الشكر على هذا العمل الطيب والمفيد مع تمنياتنا لكم بالتوفيق الدائم

    0 Not allowed!



  10. [880]
    عضو تحرير المجلة
    الصورة الرمزية aalmasri


    تاريخ التسجيل: Jun 2006
    المشاركات: 2,016
    Thumbs Up
    Received: 8
    Given: 0
    اقتباس المشاركة الأصلية كتبت بواسطة الانيق1 مشاهدة المشاركة
    نحن نشكركم جزيل الشكر على هذا العمل الطيب والمفيد مع تمنياتنا لكم بالتوفيق الدائم
    حياك الله ...وأهلا بك

    0 Not allowed!


    (رب إني لما أنزلت إلي من خير فقير)


  
الكلمات الدلالية لهذا الموضوع

عرض سحابة الكلمة الدلالية

RSS RSS 2.0 XML MAP HTML