مطلوب مهندسين شبكات وفنيين


 

صفحة 65 من 864 الأولىالأولى ... 155561 62 63 64 6566 67 68 69 75115165565 ... الأخيرةالأخيرة
النتائج 641 إلى 650 من 8635
  1. [641]
    عضو متميز
    الصورة الرمزية faiqmohmed


    تاريخ التسجيل: Jan 2006
    المشاركات: 273
    Thumbs Up
    Received: 15
    Given: 7
    اخي الكريم
    شكرا لك على كافة الجهود التي بذلتها معي او مع الاخرين
    وادعوا الله عزوجل ان يبارك فيك

    اذا تكرمت ان ترسلي هذه الابحاث

    Al-Tabtabai, H.M. and Alex, Alex P., ''Prediction of Cost Performance in Construction Projects Using Neural Networks'', Kuwait Journal of Science and Engineering, Volume 25, No. 2, 1997
    ************************************************** ***********************************
    Al-Tabtabai, H.M., Kartam, N.I., Flood, I. and Alex, P.Alex, ''Construction Project Control Using Artificial Neural Networks'', Journal of Artificial Intelligence for Engineering Design, Analysis and Manufacturing, Volume 11, No. 1, Pages 45-58, 1997
    ************************************************** *************************************

    Diekmann, J.E., Al-Tabtabai, H.M., "A Knowledge Based Approach to Construction and Project Control", International Journal of Project Management, Vol.10, No.1, pp.23-30
    ************************************************** *************************************
    Al-Tabtabai, H.M., Diekmann, J.E , "Judgemental Forecasting in Construction Projects", Construction Management and Economics, Vol.10 , No.1, pp.19-30
    ************************************************** *********************************
    Al-Tabtabai, H.M., Kartam, N.I., Flood, I. and Alex, P.Alex, ''Expert Judgment in Forecasting Construction Project Completion'', Journal of Engineering, Construction and Architectural Management, Volume 4, No. 4, 1997
    ************************************************** **********************************
    Al-Tabtabai, H.M., ''Forecasting Construction Project Completion Using Artificial Neural Networks'', Seventh Structural Engineering Arab Conference, Kuwait, page 743-748, November 24-26, 1997

    0 Not allowed!



  2. [642]
    عضو فعال جداً


    تاريخ التسجيل: Jun 2006
    المشاركات: 351
    Thumbs Up
    Received: 0
    Given: 0
    الاخ الكريم المصرى
    جزاك الله كل خير واعانك على الخير ورزقك الجنه ومجاوره الرسول والصحابه.
    كل الشكر لك لموعاونتى ومعذره لتاخرى فى الرد.

    0 Not allowed!



  3. [643]
    عضو تحرير المجلة
    الصورة الرمزية aalmasri


    تاريخ التسجيل: Jun 2006
    المشاركات: 2,016
    Thumbs Up
    Received: 8
    Given: 0
    اقتباس المشاركة الأصلية كتبت بواسطة faiqmohmed مشاهدة المشاركة
    اخي الكريم
    شكرا لك على كافة الجهود التي بذلتها معي او مع الاخرين
    وادعوا الله عزوجل ان يبارك فيك

    اذا تكرمت ان ترسلي هذه الابحاث

    Al-Tabtabai, H.M. and Alex, Alex P., ''Prediction of Cost Performance in Construction Projects Using Neural Networks'', Kuwait Journal of Science and Engineering, Volume 25, No. 2, 1997
    ************************************************** ***********************************
    Al-Tabtabai, H.M., Kartam, N.I., Flood, I. and Alex, P.Alex, ''Construction Project Control Using Artificial Neural Networks'', Journal of Artificial Intelligence for Engineering Design, Analysis and Manufacturing, Volume 11, No. 1, Pages 45-58, 1997
    ************************************************** *************************************
    Diekmann, J.E., Al-Tabtabai, H.M., "A Knowledge Based Approach to Construction and Project Control", International Journal of Project Management, Vol.10, No.1, pp.23-30
    ************************************************** *************************************
    Al-Tabtabai, H.M., Diekmann, J.E , "Judgemental Forecasting in Construction Projects", Construction Management and Economics, Vol.10 , No.1, pp.19-30
    ************************************************** *********************************
    Al-Tabtabai, H.M., Kartam, N.I., Flood, I. and Alex, P.Alex, ''Expert Judgment in Forecasting Construction Project Completion'', Journal of Engineering, Construction and Architectural Management, Volume 4, No. 4, 1997
    ************************************************** **********************************
    Al-Tabtabai, H.M., ''Forecasting Construction Project Completion Using Artificial Neural Networks'', Seventh Structural Engineering Arab Conference, Kuwait, page 743-748, November 24-26, 1997
    حياك الله اخي فائق
    وجدت اثنتين منها:

    0 Not allowed!


    طلبات الأوراق العلمية و الأبحاث ... Scientific papers Requests here الملفات المرفقة
    (رب إني لما أنزلت إلي من خير فقير)


  4. [644]
    عضو تحرير المجلة
    الصورة الرمزية aalmasri


    تاريخ التسجيل: Jun 2006
    المشاركات: 2,016
    Thumbs Up
    Received: 8
    Given: 0
    اقتباس المشاركة الأصلية كتبت بواسطة الاءنبيل مشاهدة المشاركة
    الاخ الكريم المصرى
    جزاك الله كل خير واعانك على الخير ورزقك الجنه ومجاوره الرسول والصحابه.
    كل الشكر لك لموعاونتى ومعذره لتاخرى فى الرد.
    ولك بمثله ان شاء الله
    اهلا بك دائما

    0 Not allowed!


    (رب إني لما أنزلت إلي من خير فقير)


  5. [645]
    عضو


    تاريخ التسجيل: May 2007
    المشاركات: 27
    Thumbs Up
    Received: 0
    Given: 0
    شكرا جزيلا اخي الكريم على البحوث التي وفرتها بالرغم من انها كانت كثيرة هده المرة
    فبارك الله فيك وجزاك عنا الف خير

    0 Not allowed!



  6. [646]
    عضو فعال
    الصورة الرمزية smi


    تاريخ التسجيل: May 2007
    المشاركات: 131
    Thumbs Up
    Received: 0
    Given: 0

    i m looking for any or all of the next wa gajakoom allah khairan


    Critical Factors Affecting Schedule Performance: Evidence from Indian Construction Projects

    J. Constr. Engrg. and Mgmt., Volume 132, Issue 8, pp. 871-881 (August 2006)


    Critical Success Factors for Construction Projects
    by Victor Sanvido, Member, ASCE, (Assoc. Prof., Dept. Arch. Engrg., Pennsylvania State Univ., 104 Engrg. Unit “A”, University Park, PA 16802), Francois Grobler, (Asst. Prof., Dept. Arch. Engrg., Pennsylvania State Univ., 104 Engrg. Unit “A”, University Park, PA), Kevin Parfitt, (Asst. Prof., Dept. Arch. Engrg., Pennsylvania State Univ., 104 Engrg. Unit “A”, University Park, PA), Moris Guvenis, (Formerly Res. Asst., Dept. Arch. Engrg., Pennsylvania State Univ., 104 Engrg. Unit “A”, University Park, PA), and Michael Coyle, (Formerly Res. Asst., Dept. Arch. Engrg., Pennsylvania State Univ., 104 Engrg. Unit “A”, University Park, PA)
    Journal of Construction Engineering and Management, Vol. 118, No. 1, March 1992, pp. 94-111



    Critical Success Factors for Different Project Objectives
    J. Constr. Engrg. and Mgmt., Volume 125, Issue 3, pp. 142-150 (May/June 1999)




    Approximately predicting the cost and duration of school reconstruction projects in Taiwan


    Authors: Wei Tong Chen a; Ying-Hua Huang a
    DOI: 10.1080/01446190600953805
    Published in: Construction Management and Economics, Volume 24, Issue 12 December 2006 , pages 1231 - 1239


    Evaluation of construction contractor performance: a critical analysis of some recent research


    Authors: Rick Best a; Craig Langston b
    DOI: 10.1080/01446190500435457
    Published in: Construction Management and Economics, Volume 24, Issue 4 April 2006 , pages 439 - 445




    Schedule, Cost, and Profit Control with PERT: A Comprehensive Guide for Program Management
    By Robert Wallace Miller


    Strategic use of quality function deployment (QFD) in the construction industry
    Irem Dikmen,M. Talat Birgonul and Semiha Kiziltas
    Building and Environment
    Volume 40, Issue 2, February 2005, Pages 245-255 doi:10.1016/j.buildenv.2004.07.001




    Assessing Project Success Using Subjective Evaluation Factors

    Journal
    Software Quality Journal
    Publisher
    Springer Netherlands
    ISSN
    0963-9314 (Print) 1573-1367 (Online)
    Issue
    Volume 9, Number 1 / January, 2001
    DOI
    10.1023/A:1016673203332
    Pages
    43-70
    Subject Collection
    Computer Science
    SpringerLink Date
    Thursday, October 28, 2004

    0 Not allowed!



  7. [647]
    عضو متميز
    الصورة الرمزية faiqmohmed


    تاريخ التسجيل: Jan 2006
    المشاركات: 273
    Thumbs Up
    Received: 15
    Given: 7
    بوركت اخي الكريم

    0 Not allowed!



  8. [648]
    عضو تحرير المجلة
    الصورة الرمزية aalmasri


    تاريخ التسجيل: Jun 2006
    المشاركات: 2,016
    Thumbs Up
    Received: 8
    Given: 0
    اقتباس المشاركة الأصلية كتبت بواسطة smi مشاهدة المشاركة
    i m looking for any or all of the next wa gajakoom allah khairan


    Critical Factors Affecting Schedule Performance: Evidence from Indian Construction Projects

    J. Constr. Engrg. and Mgmt., Volume 132, Issue 8, pp. 871-881 (August 2006)


    Critical Success Factors for Construction Projects
    by Victor Sanvido, Member, ASCE, (Assoc. Prof., Dept. Arch. Engrg., Pennsylvania State Univ., 104 Engrg. Unit “A”, University Park, PA 16802), Francois Grobler, (Asst. Prof., Dept. Arch. Engrg., Pennsylvania State Univ., 104 Engrg. Unit “A”, University Park, PA), Kevin Parfitt, (Asst. Prof., Dept. Arch. Engrg., Pennsylvania State Univ., 104 Engrg. Unit “A”, University Park, PA), Moris Guvenis, (Formerly Res. Asst., Dept. Arch. Engrg., Pennsylvania State Univ., 104 Engrg. Unit “A”, University Park, PA), and Michael Coyle, (Formerly Res. Asst., Dept. Arch. Engrg., Pennsylvania State Univ., 104 Engrg. Unit “A”, University Park, PA)
    Journal of Construction Engineering and Management, Vol. 118, No. 1, March 1992, pp. 94-111



    Critical Success Factors for Different Project Objectives
    J. Constr. Engrg. and Mgmt., Volume 125, Issue 3, pp. 142-150 (May/June 1999)




    Approximately predicting the cost and duration of school reconstruction projects in Taiwan


    Authors: Wei Tong Chen a; Ying-Hua Huang a
    DOI: 10.1080/01446190600953805
    Published in: Construction Management and Economics, Volume 24, Issue 12 December 2006 , pages 1231 - 1239


    Evaluation of construction contractor performance: a critical analysis of some recent research


    Authors: Rick Best a; Craig Langston b
    DOI: 10.1080/01446190500435457
    Published in: Construction Management and Economics, Volume 24, Issue 4 April 2006 , pages 439 - 445




    Schedule, Cost, and Profit Control with PERT: A Comprehensive Guide for Program Management
    By Robert Wallace Miller


    Strategic use of quality function deployment (QFD) in the construction industry
    Irem Dikmen,M. Talat Birgonul and Semiha Kiziltas
    Building and Environment
    Volume 40, Issue 2, February 2005, Pages 245-255 doi:10.1016/j.buildenv.2004.07.001




    Assessing Project Success Using Subjective Evaluation Factors

    Journal
    Software Quality Journal
    Publisher
    Springer Netherlands
    ISSN
    0963-9314 (Print) 1573-1367 (Online)
    Issue
    Volume 9, Number 1 / January, 2001
    DOI
    10.1023/A:1016673203332
    Pages
    43-70
    Subject Collection
    Computer Science
    SpringerLink Date
    Thursday, October 28, 2004
    Here is what I found

    0 Not allowed!


    طلبات الأوراق العلمية و الأبحاث ... Scientific papers Requests here الملفات المرفقة
    (رب إني لما أنزلت إلي من خير فقير)


  9. [649]
    عضو فعال
    الصورة الرمزية asas121


    تاريخ التسجيل: May 2007
    المشاركات: 88
    Thumbs Up
    Received: 0
    Given: 0
    السلاك عليكم
    اخى فى اللة أيغى هدة الأوراق للأهمية القصوى
    A hybrid fuzzy logic and PID controller for control of nonlinear HVAC systems
    Rahmati, A.; Rashidi, F.; Rashidi, M.
    Systems, Man and Cybernetics, 2003. IEEE International Conference on
    Volume 3, Issue , 5-8 Oct. 2003 Page(s): 2249 - 2254 vol.3
    Digital Object Identifier
    وهى فى
    http://ieeexplore.ieee.org/Xplore/lo...7/01244218.pdf
    ************************************************** ************************************************** ***********
    Fuzzy logic control of building management systems
    Virk, G.S.; Ghazali, A.B.; Azzi, D.
    Control apos;96, UKACC International Conference on (Conf. Publ. No. 427)
    Volume 1, Issue , 2-5 Sept. 1996 Page(s): 580 - 585 vol.1
    Digital Object Identifier
    http://ieeexplore.ieee.org/Xplore/lo...3/00651444.pdf?
    ************************************************** ********************************************
    Distributed fuzzy logic for building management systems using localoperating networks
    Kiff, A.; Warwick, K.
    Fuzzy Logic Controllers in Practice (Digest No. 1996/200), IEE Colloquium on
    Volume , Issue , 15 Nov 1996 Page(s):6/1 - 6/4
    Digital Object Identifier
    وهى فى
    http://ieeexplore.ieee.org/Xplore/lo...7/00603638.pdf
    ************************************************** ********************************************
    PID neural network control of SUT building energy management system
    Fardadi, M.; Ghafari, A.S.; Hannani, S.K.
    Advanced Intelligent Mechatronics. Proceedings, 2005 IEEE/ASME International Conference on
    Volume , Issue , 2005 Page(s): 682 - 686
    Digital Object Identifier 10.1109/AIM.2005.1511061
    فى
    http://ieeexplore.ieee.org/Xplore/lo...5/01511061.pdf
    ************************************************** **********************************
    Recursive models for multi-roomed BMS applications
    Virk, G.S.; Azzi, D.; Azad, A.K.M.; Loveday, D.L.
    Control apos;98. UKACC International Conference on (Conf. Publ. No. 455)
    Volume , Issue , 1-4 Sep 1998 Page(s):1682 - 1687 vol.2
    Digital Object Identifier
    فى
    http://ieeexplore.ieee.org/Xplore/lo...0/00726172.pdf
    وجزاك اللة كل الخير

    0 Not allowed!



  10. [650]
    عضو تحرير المجلة
    الصورة الرمزية aalmasri


    تاريخ التسجيل: Jun 2006
    المشاركات: 2,016
    Thumbs Up
    Received: 8
    Given: 0
    asas121
    I did upload these papers for you in my previous message. Please check it back.

    0 Not allowed!


    (رب إني لما أنزلت إلي من خير فقير)


  
الكلمات الدلالية لهذا الموضوع

عرض سحابة الكلمة الدلالية

RSS RSS 2.0 XML MAP HTML