مطلوب مهندسين شبكات وفنيين


 

صفحة 161 من 864 الأولىالأولى ... 61111151157 158 159 160 161162 163 164 165 171211261661 ... الأخيرةالأخيرة
النتائج 1,601 إلى 1,610 من 8635
  1. [1601]
    عضو فعال
    الصورة الرمزية smi


    تاريخ التسجيل: May 2007
    المشاركات: 131
    Thumbs Up
    Received: 0
    Given: 0


    plz i need this paper badlly jazakoom allah kol alkhair

    On-Site Subcontractor Evaluation Method Based on Lean

    Principles and Partnering Practices


    J. Mgmt. in Engrg., Volume 23, Issue 2, pp. 67-74 (April 2007)
    Sergio Maturana,1 Luis Fernando Alarcón,2 Pedro Gazmuri,3 and Mladen Vrsalovic4

    0 Not allowed!



  2. [1602]
    عضو متميز


    تاريخ التسجيل: Jun 2007
    المشاركات: 426
    Thumbs Up
    Received: 1
    Given: 0

    Thumbs up طلبات الأوراق العلمية والأبحاث



    جزاك الله كل خير على معاونتك لنا

    واثابك الله في كل ماتفعله

    وإلى الإمام - إن شاء الله -


    0 Not allowed!



  3. [1603]
    عضو


    تاريخ التسجيل: Aug 2007
    المشاركات: 39
    Thumbs Up
    Received: 0
    Given: 0
    اخى الكريم:
    جعل الله جهدك في ميزان حسناتك,احتاج الى بعض الاوراق العلميه واتمنى ان اجدها عندك!!!
    three pahse four wire active power filter

    0 Not allowed!



  4. [1604]
    عضو تحرير المجلة
    الصورة الرمزية aalmasri


    تاريخ التسجيل: Jun 2006
    المشاركات: 2,016
    Thumbs Up
    Received: 8
    Given: 0
    اقتباس المشاركة الأصلية كتبت بواسطة حميد بلاسم ماهود مشاهدة المشاركة
    الاخ المصري المحترم السلام عليكم ورحمة الله
    ارجو الحصول على البحوث التالية:

    Bubble transport in flashing flow
    International Journal of Multiphase Flow, Volume 26, Issue 2, February 2000, Pages 191-206
    E. Elias and P. L. Chambré

    Modelling of bubble dynamics in a venturi flow with a potential flow method
    Chemical Engineering Science, Volume 56, Issues 21-22, November 2001, Pages 6427-6435
    M. J. Gaston, J. A. Reizes and G. M. Evans

    ولكم جزيل الشكر
    تفضل...وللاسف مرة اخرى الورقتان الاخريان غير متوفرتين...لا اعلم ان كان يمكن الاخ dressto الحصول عليها ام لا

    0 Not allowed!


    طلبات الأوراق العلمية و الأبحاث ... Scientific papers Requests here الملفات المرفقة
    • نوع الملف: pdf 001.pdf‏ (306.3 كيلوبايت, 8 مشاهدات)
    • نوع الملف: pdf 002.pdf‏ (513.3 كيلوبايت, 6 مشاهدات)
    (رب إني لما أنزلت إلي من خير فقير)


  5. [1605]
    عضو تحرير المجلة
    الصورة الرمزية aalmasri


    تاريخ التسجيل: Jun 2006
    المشاركات: 2,016
    Thumbs Up
    Received: 8
    Given: 0
    اقتباس المشاركة الأصلية كتبت بواسطة smi مشاهدة المشاركة

    plz i need this paper badlly jazakoom allah kol alkhair

    On-Site Subcontractor Evaluation Method Based on Lean

    Principles and Partnering Practices

    J. Mgmt. in Engrg., Volume 23, Issue 2, pp. 67-74 (April 2007)
    Sergio Maturana,1 Luis Fernando Alarcón,2 Pedro Gazmuri,3 and Mladen Vrsalovic4
    لم تتوفر بعد

    0 Not allowed!


    (رب إني لما أنزلت إلي من خير فقير)


  6. [1606]
    جديد


    تاريخ التسجيل: May 2007
    المشاركات: 9
    Thumbs Up
    Received: 0
    Given: 0
    السلام عليكم
    ارجو محاولة موافاتى بالكتاب التالي
    Dynamic simulation of Electric Machinery using Matlab/simulink.
    written by : chee-mun ong

    0 Not allowed!



  7. [1607]
    عضو فعال


    تاريخ التسجيل: Mar 2007
    المشاركات: 111
    Thumbs Up
    Received: 0
    Given: 0
    انا ممتن جدا وجزاك الله كل خير

    0 Not allowed!



  8. [1608]
    عضو فعال
    الصورة الرمزية smi


    تاريخ التسجيل: May 2007
    المشاركات: 131
    Thumbs Up
    Received: 0
    Given: 0
    الاخوة الاعزاء جعل الله ماتقدمونه لاخونكم في ميزان اعمالكم الصالحه ووفقكم ورعاكم
    انا بحاجة ماسه جدا
    [
    Alarcón, L., Diethelm, S., Rojo, O., and Calderón, R. _2005_. “Assessing the impacts of implementing lean construction.” Proc., 13th Ann.Cong. Int. Group for Lean Construction, IGLC-13, Sydney, Australia.

    Alarcón, L., and Mourgues, C. _2002_. “Performance modeling for contractor selection.” J. Manage. Eng., 18_2_, 52–60.

    Ballard, G., and Howell, G. _1998_. “Shielding production: Essential step in production control.” J. Constr. Eng. Manage., 124_1_, 11–17.

    Chan, A., et al. _2004_. “Exploring critical success factors for partnering in construction projects.” J. Constr. Eng. Manage., 130_2_, 188–198.

    Dainty, A., Briscoe, G., and Millet, S. _2001_. “New perspectives on construction supply chain integration.” Supply Chain Management:An Int. J., 6_4_, 163–173.

    Elazouni, A., and Metwally, F. _2000_. “D-SUB: Decision support system for subcontracting construction works.” J. Constr. Eng. Manage., 126_3_, 191–200.

    Fu, W., Drew, D., and Lo, H. _2003_. “Competitiveness of inexperienced and experienced contractors in bidding.” J. Constr. Eng. Manage.,129_4_, 388–395.

    Hatush, Z., and Skitmore, M. _1998_. “Contractor selection using multi criteriautility theory: An additive model.” Build. Environ., 33_2–3_,105–115.

    Konchar, M., and Sanvido, V. _1998_. “Comparison of U.S. project delivery systems.” J. Constr. Eng. Manage., 124_6_, 435–444.

    Kumaraswamy, M., and Matthews, J. _2000_. “Improved subcontractor selection employing partnering principles.” J. Manage. Eng., 16_3_,47–57.

    Latham, M. _1994_. “Constructing the team.” Final Rep. on Joint Reviewof Procurement and Contractual Agreements in the UK Construction Industry, HMSO, London.

    Miller, C., Packham, G., and Thomas, B. _2001_. “Harmonization and lean construction: Acknowledging the role of the small subcontracting firm.” Rep. No. 15, Welsh Enterprise Institute, Univ. of Glamorgan Business School, Pontypridd, U.K.

    Minchin, E., and Smith, G. _2005_. “Quality-based contractor rating model for qualification and bidding purposes.” J. Manage. Eng., 21_1_, 38–43.

    Rahman, M., and Kumaraswamy, M. _2004_. “Potential for implementing relational contracting and joint risk management.” J. Manage. Eng., 20_4_, 178–189.

    Russell, J. S., and Skibniewski, M. J. _1988_. “Decision criteria in con-tractor prequalification.” J. Manage. Eng., 4_2_, 148–164.
    Singh, D., and Tiong, R. _2005_. “A fuzzy decision framework for contractor selection.” J. Constr. Eng. Manage., 131_1_, 62–70.

    Sônmez, M., Holt, G., Yang, J. B., and Graham, G. _2002_. “Applying evidential reasoning to prequalifying construction contractors.” J.Manage. Eng., 18_3_, 111–119.

    Tam, C., Deng, Z., Zeng, S., and Ho, C. _2000_. “Performance assessment scoring system of public housing construction for quality improvement in Hong Kong.” Int. J. Qual. Reliab. Manage., 17_4–5_, 467–478.

    Topcu, Y. _2004_. “A decision model proposal for construction contractor selection in Turkey.” Build. Environ., 39, 469–481.

    Vrijhoef, R., Koskela, L., and Howell, G. _2001_. “Understanding construction supply chains: An alternative interpretation.” Proc., 9th Ann.Conf. Int. Group for Lean Construction, IGLC-9, Singapore.

    Wegelius-Lehtonen, T. _2001_. “Performance measurement in construction
    logistics.” Int. J. Prod. Econ., 69_1_, 107–116.



    0 Not allowed!



  9. [1609]
    عضو فعال


    تاريخ التسجيل: Mar 2007
    المشاركات: 111
    Thumbs Up
    Received: 0
    Given: 0
    ارجو الحصول على الابحاث التالية مع شكري وامتناني:

    A mechanistic model for the analysis of flashing phenomena
    Annals of Nuclear Energy, Volume 23, Issue 10, July 1996, Pages 801-811
    Takanobu Watanabe, Goung Jin Lee, Takashi Iseki and Mamoru Ishii


    Comparative study of flash evaporation rates
    Desalination, Volume 96, Issues 1-3, June 1994, Pages 163-171
    Osamu Miyatake

    Nucleation and flashing in nozzles—1. A distributed nucleation model
    International Journal of Multiphase Flow, Volume 19, Issue 6, December 1993, Pages 943-964
    T. S. Shin and O. C. Jones

    A mechanistic model for the analysis of flashing phenomena
    Annals of Nuclear Energy, Volume 23, Issue 10, July 1996, Pages 801-811
    Takanobu Watanabe, Goung Jin Lee, Takashi Iseki and Mamoru Ishii


    Two-phase flow through pressure safety valves. Experimental investigation and model prediction
    Chemical Engineering Science, Volume 60, Issue 19, September 2005, Pages 5284-5293
    Gino Boccardi, Roberto Bubbico, Gian Piero Celata and Barbara Mazzarotta


    ولكم خالص شكري وامتناني

    0 Not allowed!



  10. [1610]
    جديد


    تاريخ التسجيل: Oct 2007
    المشاركات: 1
    Thumbs Up
    Received: 0
    Given: 0
    السلام عليكم يا اخي
    اريد بشدة كتاب
    mircoelectronics(sedra and smith
    digital entegrated electronics(taub & schilling

    0 Not allowed!



  
الكلمات الدلالية لهذا الموضوع

عرض سحابة الكلمة الدلالية

RSS RSS 2.0 XML MAP HTML