مطلوب مهندسين شبكات وفنيين


 

صفحة 135 من 864 الأولىالأولى ... 3585125131 132 133 134 135136 137 138 139 145185235635 ... الأخيرةالأخيرة
النتائج 1,341 إلى 1,350 من 8635
  1. [1341]
    عضو فعال
    الصورة الرمزية smi


    تاريخ التسجيل: May 2007
    المشاركات: 131
    Thumbs Up
    Received: 0
    Given: 0
    Chan, P.C.A., Ho, C.K.D. and Tam, C.M. (2001) Design
    and build project success factors: multivariate analysis.

    Journal of Construction Engineering and Management
    127(2),
    93–100.

    Cox, R.F., Issa, R.R.A. and Ahrens, D. (2003) Management’s
    perception of key performance indicators for
    construction. Journal of Construction Engineering and
    Management, 129(2), 141–51.

    Greene, W.H. (1997) Econometric Analysis, Prentice Hall
    International, New Jersey.

    Hegazy, T. and Ayed, A. (1998) Neural network model for
    parametric cost estimation of highway projects. Journal of
    Construction Engineering and Management, 124(3), 210–18.

    Kaming, P.F.K., Olomolaiye, P.O., Holt, G. and Harris, F.C.

    (1997) Factors influencing construction time and cost
    overruns on high-rise projects in Indonesia. Construction
    Management and Economics, 15(1), 83–94.

    Kenkel, J.L. (1989) Introductory Statistics for Management and
    Economics, PWS-Kent Pub. Co., Boston.

    Konchar, M. and Sanvido, V. (1998) Comparison of U.S.

    project delivery systems. Journal of Construction Engineering
    and Management, 124(6), 435–44.


    0 Not allowed!



  2. [1342]
    عضو فعال
    الصورة الرمزية smi


    تاريخ التسجيل: May 2007
    المشاركات: 131
    Thumbs Up
    Received: 0
    Given: 0
    can you plz help me gajakoom allah kol alkhair
    Silver, M. and Heravi, S. (2002) Quality adjustment for PPP:
    principles and an empirical study, in
    Conference on the

    International Comparison Program
    , Washington, DC, 11–14
    March.

    Statistics Bureau (2004) Statistical Handbook of Japan,
    Ministry of Internal Affairs and Communication, Japan,
    available at www.stat.go.jp/english/data/handbook/c06cont.
    htm
    #cha6_6.

    Thompson, J. (2004) Personal communication, Arizona State
    University.
    UNECE (2002) United Nations Economic Commission to
    Europe, available at www.unece.org/env/hs/bulletin/02pdf/
    pubH13_02.pdf.
    Vermande, H. and van Mulligen, P-H. (1999) Construction
    costs in The Netherlands in an international context.

    Construction Management and Economics
    , 17, 269–83.
    Walker, D. (1995) An investigation into construction time
    performance.
    Construction Management and Economics, 13,
    263–74.
    Walsh, K. and Sawhney, A. (2002) International comparison
    of cost for the construction sector: towards a conceptual
    model for purchasing power parity, report submitted to the
    World Bank Group, June 2002.
    Walsh, K. and Sawhney, A. (2004) International Comparison
    of Cost for the Construction Sector: An Implementation
    Framework for the Basket of Construction Components
    Approach. Report submitted to the African Development
    Bank and the World Bank Group, June 2004.
    Xiao, H., Proverbs, D., Shaw, T. and Holt, G. (2000) A new
    approach to comparing the performance of contractors
    internationally, in
    Proceedings of 16th ARCOM Conference,
    Glasgow Caledonian University.
    Xiao, H. and Proverbs, D. (2002a) The performance of
    contractors in Japan, the UK and the USA.
    International
    Journal of Quality & Reliability Management
    , 19(6), 672–87.
    Xiao, H. and Proverbs, D. (2002b) The performance of
    contractors in Japan, the UK and the USA: a comparative
    evaluation of construction cost.
    Construction Management
    and Economics
    , 20b, 425–35.
    Xiao, H. and Proverbs, D. (2002c) Construction time
    performance: An evaluation of contractors in Japan, the
    UK and the US.
    Engineering Architectural and Construction
    Management
    , 2, pp. 81–9.
    Xiao, H., Proverbs, D. and Holt, G. (2002d) A new paradigm
    for international contractor performance assessment.

    Journal of Construction Research
    , in press.


    0 Not allowed!



  3. [1343]
    عضو فعال
    الصورة الرمزية smi


    تاريخ التسجيل: May 2007
    المشاركات: 131
    Thumbs Up
    Received: 0
    Given: 0

    help me

    can you plz help me to get the next papers

    An investigation into construction time performance
    Author: Derek H. T. Walker a


    DOI: 10.1080/01446199500000030
    Published in: Construction Management and Economics, Volume 13, Issue 3 May 1995 , pages 263 - 274
    Development of a conceptual model of construction partnering
    Eddie W. L. Cheng, Heng Li (2001)
    Engineering Construction and Architectural Management 8 (4), 292–303.
    doi:10.1046/j.1365-232x.2001.00210.x
    Predicting construction firm performance: an empirical assessment of the differential impact between industry- and firm-specific factors
    Author: Florence T. T. Phua a
    DOI: 10.1080/01446190500435127
    Published in: Construction Management and Economics, Volume 24, Issue 3 March 2006 , pages 309 - 320


    Benchmarking design-build procurement systems in construction
    Author(s): Edmond W.M. Lam, Albert P.C. Chan, Daniel W.M. Chan
    Journal: Benchmarking: An International Journal
    ISSN: 1463-5771
    Year: 2004 Volume: 11 Issue: 3 Page: 287 - 302
    DOI: 10.1108/14635770410538763
    Publisher: Emerald Group Publishing Limited


    Reducing Variability to Improve Performance as a Lean Construction Principle

    J. Constr. Engrg. and Mgmt., Volume 128, Issue 2, pp. 144-154 (March/April 2002)
    H. Randolph Thomas,1 M.ASCE; Michael J. Horman,2 Ubiraci Espinelli Lemes de Souza,3 and Ivica Zavski4

    Partnering in construction: a critical review of issues, problems and dilemmas
    Authors: Mike Bresnen; Nick Marshall
    DOI: 10.1080/014461900370852
    Publication Frequency: 12 issues per year
    Published in: Construction Management and Economics, Volume 18, Issue 2 March 2000 , pages 229 - 237



    Performance management in construction: a conceptual framework
    Authors: Michail Kagioglou; Rachel Cooper; Ghassan Aouad
    DOI: 10.1080/01446190010003425
    Publication Frequency: 12 issues per year
    Published in: Construction Management and Economics, Volume 19, Issue 1 January 2001 , pages 85 - 9

    Contributors to construction delays
    Authors: Mohan M. Kumaraswamy; Daniel W. M. Chan
    DOI: 10.1080/014461998372556
    Publication Frequency: 12 issues per year
    Published in: Construction Management and Economics, Volume 16, Issue 1 January 1998 , pages 17 - 29

    Management's Perception of Key Performance Indicators for Construction

    J. Constr. Engrg. and Mgmt., Volume 129, Issue 2, pp. 142-151 (March/April 2003)
    Robert F. Cox,1 Raja R. A. Issa,2 M.ASCE; and Dar Ahrens3
    Enhancing integration and innovation in construction
    Authors: Mohammed Fadhil Dulaimi a; Florence Y. Y.Ling a; George Ofori a; Nayanthara De Silva a
    DOI: 10.1080/09613210110115207
    Published in: Building Research & Information, Volume 30, Issue 4 July 2002 , pages 237 - 247
    The performance of contractors in Japan, the UK and the USA: a comparative evaluation of construction cost
    Authors: Hong Xiao; David Proverbs
    DOI: 10.1080/01446190210145859
    Published in: Construction Management and Economics, Volume 20, Issue 5 July 2002 , pages 425 - 43
    Evaluating contractor prequalification data: selection criteria and project success factors
    Authors: Zedan Hatush a; Martin Skitmore b
    DOI: 10.1080/01446199700000002
    Publication Frequency: 12 issues per year
    Published in: Construction Management and Economics, Volume 15, Issue 2 March 1997 , pages 129 - 147



    Capturing the cost of non-conformance on construction sites: An application of the quality cost matrix
    Author(s): H. Abdul-Rahman, P.A. Thompson, I.L. Whyte
    Journal: International Journal of Quality & Reliability Management
    ISSN: 0265-671X
    Year: 1996 Volume: 13 Issue: 1 Page: 48 - 60
    DOI: 10.1108/02656719610108314
    Publisher: MCB UP Ltd

    0 Not allowed!



  4. [1344]
    عضو فعال
    الصورة الرمزية smi


    تاريخ التسجيل: May 2007
    المشاركات: 131
    Thumbs Up
    Received: 0
    Given: 0

    help me

    An investigation into construction time performance
    Author: Derek H. T. Walker a
    DOI: 10.1080/01446199500000030
    Published in: Construction Management and Economics, Volume 13, Issue 3 May 1995 , pages 263 - 274
    Development of a conceptual model of construction partnering
    Eddie W. L. Cheng, Heng Li (2001)
    Engineering Construction and Architectural Management 8 (4),
    292–303.
    doi:10.1046/j.1365-232x.2001.00210.x
    Predicting construction firm performance: an empirical assessment of the differential impact between industry- and firm-specific factors
    Author: Florence T. T. Phua a
    DOI: 10.1080/01446190500435127 Construction Management and Economics, Volume 24, Issue 3 March 2006 , pages 309 - 320
    Benchmarking design-build procurement systems in construction

    Edmond W.M. Lam, Albert P.C. Chan, Daniel W.M. Chan
    Benchmarking: An International Journal
    ISSN: 1463-5771
    Year: 2004 Volume: 11 Issue: 3 Page: 287 - 302
    DOI: 10.1108/14635770410538763
    Publisher: Emerald Group Publishing Limited


    Reducing Variability to Improve Performance as a Lean Construction Principle

    J. Constr. Engrg. and Mgmt., Volume 128, Issue 2, pp. 144-154 (March/April 2002) H. Randolph Thomas,1 M.ASCE; Michael J. Horman,2 Ubiraci Espinelli Lemes de Souza,3 and Ivica Zavski4


    Partnering in construction: a critical review of issues, problems and dilemmas
    Authors: Mike Bresnen; Nick Marshall
    DOI: 10.1080/014461900370852
    Construction Management and Economics, Volume 18, Issue 2 March 2000 , pages 229 - 237

    Performance management in construction: a conceptual framework
    Authors: Michail Kagioglou; Rachel Cooper; Ghassan Aouad
    DOI: 10.1080/01446190010003425
    Publication Frequency: 12 issues per year
    Construction Management and Economics, Volume 19, Issue 1 January 2001 , pages 85 - 9

    Contributors to construction delays
    Authors: Mohan M. Kumaraswamy; Daniel W. M. Chan
    DOI: 10.1080/014461998372556
    Construction Management and Economics, Volume 16, Issue 1 January 1998 , pages 17 - 29

    Management's Perception of Key Performance Indicators for Construction
    J. Constr. Engrg. and Mgmt., Volume 129, Issue 2, pp. 142-151 (March/April 2003)
    Robert F. Cox,1 Raja R. A. Issa,2 M.ASCE; and Dar Ahrens3
    Enhancing integration and innovation in construction
    Mohammed Fadhil Dulaimi a; Florence Y. Y.Ling a; George Ofori a; Nayanthara De Silva a
    DOI: 10.1080/09613210110115207
    Building Research & Information, Volume 30, Issue 4 July 2002 , pages 237 - 247

    The performance of contractors in Japan, the UK and the USA: a comparative evaluation of construction cost
    Hong Xiao; David Proverbs
    DOI: 10.1080/01446190210145859
    Construction Management and Economics, Volume 20, Issue 5 July 2002 , pages 425 - 43

    Evaluating contractor prequalification data: selection criteria and project success factors
    Authors: Zedan Hatush a; Martin Skitmore b
    DOI: 10.1080/01446199700000002
    Publication Frequency: 12 issues per year
    Construction Management and Economics, Volume 15, Issue 2 March 1997 , pages 129 - 147

    Capturing the cost of non-conformance on construction sites: An application of the quality cost matrix
    H. Abdul-Rahman, P.A. Thompson, I.L. Whyte
    International Journal of Quality & Reliability Management
    ISSN: 0265-671X
    1996 Volume: 13 Issue: 1 Page: 48 - 60
    DOI: 10.1108/02656719610108314
    Publisher: MCB UP Ltd

    0 Not allowed!



  5. [1345]
    عضو فعال


    تاريخ التسجيل: Dec 2006
    المشاركات: 88
    Thumbs Up
    Received: 0
    Given: 0
    اقتباس المشاركة الأصلية كتبت بواسطة حميد بلاسم ماهود مشاهدة المشاركة
    السلام عليكم واشكركم كثيرا لمساعدتكم وارجو ان امكن الحصول على البحوث التالية:

    Meknassi et al.(2000)" Numerical modeling of wavy stratified two-phase flow in pipes",Chem. Eng. Sci.,V.55, pp.4682-4697

    Newton et al.(2000)" Numerical calculation of turbulent stratified gas-liquid ppipe flow" Int. J. Multiphase Flow, V. 26, pp.327-337

    Newton et al.(2000)"Numerical model of startified wavy gas-liquid pipe flow" Chem. Eng. Sci., V56, pp.6851-6861

    Aloui et al.(1999)" Bubbly flow in an axisymmetric sdden expansion: pressure drop, void fraction,wall shear stress,bubble velocities and sizes" Exp. Term. Fluid Scie., V.18, pp.118-130

    Attou et al.(1997)" Modeling of steady state two-phase bubbly flow through sudden enlargement " Int. J. Heat Mass Transfer, V.40, p.3375-3385

    Schmidt et al.(1996)" Two phase pressure change across sudden expansion n duct areas" Chem. Eng. Commun., V.141, pp.175-190

    Wadle (1999)" A new formula for the pressure recovery in an abrupt diffuser" Int. J. Multiphase Flow, V.15, pp.241-256

    ولكم فائق شكري ودعائي بالتوفق والسداد
    و عليكم السلام
    من فضلك تأكد من عدم تكرار طلب الأبحاث بعد توفيرها

    http://mihd.net/qx7olp

    0 Not allowed!



  6. [1346]
    عضو فعال


    تاريخ التسجيل: Apr 2007
    المشاركات: 79
    Thumbs Up
    Received: 1
    Given: 0
    من فضلك أن تساعدني بهذه الأوراق العلمية:

    1- Active Isolation of Machine Foundations by In-Filled Trench
    J. Geotech. Engrg., Volume 122, Issue 4, pp. 288-294 (April 1996)
    T. M. Al-Hussaini AND S. Ahmad
    2- Investigation on Active Isolation of Machine Foundations by Open Trenches

    J. Geotech. Engrg., Volume 122, Issue 6, pp. 454-461 (June 1996)
    S. Ahmad , T. M. Al-Hussaini AND K. L. Fishman

    3- Simplified Model for Vertical Vibrations of Surface Foundations

    J. Geotech. and Geoenvir. Engrg., Volume 132, Issue 5, pp. 651-655 (May 2006)
    Shi-Shuenn Chen1 and Jun-Yang Shi

    4- Predicting Soil and Structure Vibrations from Impact Machines

    J. Geotech. and Geoenvir. Engrg., Volume 128, Issue 7, pp. 602-612 (July 2002)
    Mark R. Svinkin

    5- Vibration of Foundations on Incompressible Soils with No Elastic Region

    J. Geotech. Engrg., Volume 120, Issue 9, pp. 1570-1592 (September 1994)
    Ronaldo I. Borja,and Wen-Hwa Wu,

    0 Not allowed!



  7. [1347]
    عضو فعال


    تاريخ التسجيل: Dec 2006
    المشاركات: 88
    Thumbs Up
    Received: 0
    Given: 0
    اقتباس المشاركة الأصلية كتبت بواسطة smi مشاهدة المشاركة
    An investigation into construction time performance
    Author: Derek H. T. Walker a
    DOI: 10.1080/01446199500000030
    Published in: Construction Management and Economics, Volume 13, Issue 3 May 1995 , pages 263 - 274
    Development of a conceptual model of construction partnering
    Eddie W. L. Cheng, Heng Li (2001)
    Engineering Construction and Architectural Management 8 (4),
    292–303.
    doi:10.1046/j.1365-232x.2001.00210.x
    Predicting construction firm performance: an empirical assessment of the differential impact between industry- and firm-specific factors
    Author: Florence T. T. Phua a
    DOI: 10.1080/01446190500435127 Construction Management and Economics, Volume 24, Issue 3 March 2006 , pages 309 - 320
    Benchmarking design-build procurement systems in construction

    Edmond W.M. Lam, Albert P.C. Chan, Daniel W.M. Chan
    Benchmarking: An International Journal
    ISSN: 1463-5771
    Year: 2004 Volume: 11 Issue: 3 Page: 287 - 302
    DOI: 10.1108/14635770410538763
    Publisher: Emerald Group Publishing Limited


    Reducing Variability to Improve Performance as a Lean Construction Principle

    J. Constr. Engrg. and Mgmt., Volume 128, Issue 2, pp. 144-154 (March/April 2002) H. Randolph Thomas,1 M.ASCE; Michael J. Horman,2 Ubiraci Espinelli Lemes de Souza,3 and Ivica Zavski4


    Partnering in construction: a critical review of issues, problems and dilemmas
    Authors: Mike Bresnen; Nick Marshall
    DOI: 10.1080/014461900370852
    Construction Management and Economics, Volume 18, Issue 2 March 2000 , pages 229 - 237

    Performance management in construction: a conceptual framework
    Authors: Michail Kagioglou; Rachel Cooper; Ghassan Aouad
    DOI: 10.1080/01446190010003425
    Publication Frequency: 12 issues per year
    Construction Management and Economics, Volume 19, Issue 1 January 2001 , pages 85 - 9

    Contributors to construction delays
    Authors: Mohan M. Kumaraswamy; Daniel W. M. Chan
    DOI: 10.1080/014461998372556
    Construction Management and Economics, Volume 16, Issue 1 January 1998 , pages 17 - 29

    Management's Perception of Key Performance Indicators for Construction
    J. Constr. Engrg. and Mgmt., Volume 129, Issue 2, pp. 142-151 (March/April 2003)
    Robert F. Cox,1 Raja R. A. Issa,2 M.ASCE; and Dar Ahrens3
    Enhancing integration and innovation in construction
    Mohammed Fadhil Dulaimi a; Florence Y. Y.Ling a; George Ofori a; Nayanthara De Silva a
    DOI: 10.1080/09613210110115207
    Building Research & Information, Volume 30, Issue 4 July 2002 , pages 237 - 247

    The performance of contractors in Japan, the UK and the USA: a comparative evaluation of construction cost
    Hong Xiao; David Proverbs
    DOI: 10.1080/01446190210145859
    Construction Management and Economics, Volume 20, Issue 5 July 2002 , pages 425 - 43

    Evaluating contractor prequalification data: selection criteria and project success factors
    Authors: Zedan Hatush a; Martin Skitmore b
    DOI: 10.1080/01446199700000002
    Publication Frequency: 12 issues per year
    Construction Management and Economics, Volume 15, Issue 2 March 1997 , pages 129 - 147

    Capturing the cost of non-conformance on construction sites: An application of the quality cost matrix
    H. Abdul-Rahman, P.A. Thompson, I.L. Whyte
    International Journal of Quality & Reliability Management
    ISSN: 0265-671X
    1996 Volume: 13 Issue: 1 Page: 48 - 60
    DOI: 10.1108/02656719610108314
    Publisher: MCB UP Ltd
    اليك الأبحاث عدا البحث الأول

    http://mihd.net/cfr5bm

    0 Not allowed!



  8. [1348]
    جديد


    تاريخ التسجيل: Feb 2006
    المشاركات: 4
    Thumbs Up
    Received: 0
    Given: 0
    السلام عليكم اخ saqure وجميع الاخوان في المنتدى

    ارجوا المقالات التالية
    Lyapunov exponent of EEG signal for epileptic seizure characterization
    http://ieeexplore.ieee.org/Xplore/lo...9/01523016.pdf


    Visualization of the Short Term Maximum Lyapunov Exponent Topography in the Epileptic Brain
    http://ieeexplore.ieee.org/xpl/freea...number=4029944

    0 Not allowed!



  9. [1349]
    عضو


    تاريخ التسجيل: May 2006
    المشاركات: 38
    Thumbs Up
    Received: 0
    Given: 0
    بارك الله فيكم وجزاك الله عنا خير جزاء
    ان امكن هذه الاوراق مع الشكر الجزيل

    0 Not allowed!



  10. [1350]
    عضو


    تاريخ التسجيل: May 2006
    المشاركات: 38
    Thumbs Up
    Received: 0
    Given: 0
    Non-delay scheduling as a managerial approach for managing projects
    Zwikael, O. / Cohen, Y. / Sadeh, A. , International Journal of Project Management, 24 (4), p.330-336, May 2006

    . Association news
    International Journal of Project Management, 5 (3), p.187-191, Aug 1987

    • Risk analysis in project management
    International Journal of Project Management, Volume 5, Issue 1, February 1987, Pages 29-34
    Armin Franke

    • Non-delay scheduling as a managerial approach for managing projects
    International Journal of Project Management, Volume 24, Issue 4, May 2006, Pages 330-336
    Ofer Zwikael, Yuval Cohen and Arik Sadeh

    • Paul D. Gardiner, Project Management: A Strategic Planning Approach, Palgrave Macmillan (2005) ISBN 0 333982223 Price £28.99, Pages 322.
    International Journal of Project Management, Volume 24, Issue 6, August 2006, Page 536

    • Proactive schedule management of industrial turnkey projects in developing countries
    International Journal of Project Management, Volume 22, Issue 1, January 2004, Pages 75-85
    Wafa Alsakini, Kim Wikström and Juhani Kiiras

    • Project-breakdown structure: the tool for representing the project system in project management
    International Journal of Project Management, Volume 9, Issue 3, August 1991, Pages 157-161
    R de Heredia Scasso and G Santana Larenas

    • Improving efficiency: time-critical interfacing of project tasks
    International Journal of Project Management, Volume 20, Issue 2, February 2002, Pages 143-153
    Ari-Pekka Hameri and Jussi Heikkilä

    • On task evolvement in renewal projects
    Pages 346-353
    Anne Live Vaagaasar and Erling S. Andersen International Journal of Project Management, 25 (4), p.346-353, May 2007

    A Decision Support System for Ship Maintenance Capacity Planning
    de Boer, R. / Schutten, J.M.J. / Zijm, W.H.M. , CIRP Annals - Manufacturing Technology, 46

    Incorporating operational experience and design changes in availability forecasts
    Norman, D. , Reliability Engineering and System Safety, 20 (4), p.245-261, Jan 1988
    Failure analysis and failure prevention in electric power systems
    Rau, C.A. / Becker, D.G. / Besuner, P.M. / Cipolla, R.C. / Egan, G.R. / Gupta, P. / Johnson, D.P. / (...) / Rettig, T.W. , Nuclear Engineering and Design, 43 (1), p.1-97, Aug 1977

    0 Not allowed!



  
الكلمات الدلالية لهذا الموضوع

عرض سحابة الكلمة الدلالية

RSS RSS 2.0 XML MAP HTML