1. Request for quotation (RFQ) from different suppliers • Items are of relatively low dollar value such as supplies and materials • A survey of potential suppliers is completed. • The quotation request informing suppliers of the goods or services needed is sent to a scaled-down number of possible suppliers. 2. Request for proposal (RFP): • Items or services are usually high dollar and non-standard. • Examples: construction project, a research and development project; a made-to-order, highly complex piece of machinery. • Blueprints, drawings, specifications, and other appropriate data should be included with proposal. 3. Invitation for bid (IFB): • Appropriate for high dollar, standard items. • A perquisite to this process is a clear and accurate description of the supplies, equipment, and services required. • Includes specifications, drawings, industry standards, performance requirements, etc. • Must ensure fair competition among all bidders. • Provisions should be stated in such a manner to avoid misinterpretation. • Formal bids are submitted to the contracting department in sealed envelopes. All bids are opened at a specific time. • In most cases, the contract award goes to the lowest responsible bidder. If not awarded to the lowest bidder, must document reasons, carefully. • Type of contract is open to fraud, collusion, and other dishonest conduct. Hence, PM and contracting personnel must practice defined ethical business procedures. Contract Types Two principal types of contracts: cost and fixedUnit Price: Simple purchase order Fixed price per unit of goods or service Cost-Plus-Award-Fee (CPAF): (from the Frame Book) • An award pool is created. The level of award is determined by an award committee. • Buyers have more flexibility than CPIF. Subjective judgments can be used to determine rewards (such as a contractor's attitude). • Type of contract is gaining with popularity. • Downside: administrative cost is high due to award committee. The following contracts are ordered in increasing risk to the seller and decreasing risk to the buyer: Cost-Plus-Percentage of Cost (CPPC):• Seller is reimbursed for allowable costs of performing the contract and receives as profit an agreed upon percentage of the costs. • No limit on the seller's profit. If the seller's cost increases, so does the profit. • Most undesirable type of contract from buyer's standpoint. • Prohibited for federal government use. Used in private industry, particularly construction projects. • Susceptible to abuse. No motivation for seller to decrease costs. The buyer bears 100% of the risk. • The buyer project manager must pay particular attention to the control of the labor and material costs so that the seller does not purposely increase these costs. • Bottom line: no limit on seller's profit! Cost-Plus-Fixed Fee (CPFF):• Seller is reimbursed for allowable costs of performing the contract and receives as profit a fixed fee payment based on the percentage of the estimated costs. • The fixed fee does not vary with actual costs unless the scope of work changes. • Susceptible to abuse in that there is a ceiling on profit, but no motivation to decrease costs. • Primarily used in research projects where the effort required to achieve success is uncertain until well after the contract is signed. • Bottom line: limit on profit but no incentive to control costs. Cost-Plus-Incentive Fee (CPIF):• Seller is paid for allowable performance costs along with a predetermined fee and an incentive bonus. • If the final costs are less than the expected costs, both the buyer and seller benefit by the cost savings based on a pre-negotiated sharing formula. • The sharing formula reflects the degree of uncertainty faced by each party. • Primarily used when contracts involve a long performance period with a substantial amount of hardware development and test requirements. Risk is shared by both buyer and seller. • Bottom line: provides incentive to seller to reduce costs by increasing profit potential. Fixed Price-Plus-Incentive Fee (FPI):• Most complex type of contract. • Consists of target cost, target profit, target price, ceiling price, and share ratio. • For every dollar the seller can reduce costs below the target cost, the savings will be shared by the seller and buyer based on the share ratio. • The share ratio is a negotiated formula which reflects the degree of uncertainty faced by each party. • If the costs exceed the ceiling price, the seller receives no profit. Regardless of the actual costs, the buyer pays no more than the ceiling price. Risk is shared by both buyer and seller, but risk is usually higher for seller. • Usually used when contracts are for a substantial sum and involve a long production time. • Bottom line: provides incentive to decrease costs which in turn increases profits. If costs exceed a ceiling, then contractor is penalized. Firm-Fixed Price (FFP):• Seller agrees to perform a service or furnish supplies at the established contract price. • Will also be called lump sum. Seller bears the greatest degree of risk. • Seller is motivated to decrease costs by producing efficiently. • Best specifications are available and costs are relatively certain. • Common type of contract. (Used by IBM) Examples of Contract TypesCPPC: Cost-Plus-Percentage of Cost Estimated cost: $1,000K Percentage: 10% ($100K) Estimated total price: $1,100K (Estimated cost + 10%*Estimated cost) If cost increases to $1,100K the total price would be $1,100K plus 10% of the actual costs = $1,210K. CPFF: Cost-Plus-Fixed Fee Estimated cost: $1,000K Percentage: 10% ($100K) Estimated total price: $1,100K (Estimated cost + 10%*Estimated cost) If cost increases to $1,100K the total price would be $1,100K plus 10% of the original estimated costs = $1,200K. CPIF: Cost-Plus-Incentive Fee Estimated cost: $1,000K Predetermined fee: $100K Sharing formula: 85/15 (buyer absorbs 85% of the uncertainty and the seller absorbs 15% of the risk) Actual cost: $800K Savings: $200K Seller gets: $800K + $100K + $30K = $930K (Actual cost + Fee + 15%*Savings) Buyer saves: $170K FPI: Fixed Price-Plus-Incentive Fee Target cost: $1,000K Target profit: $100K (Seller's fee) Target price: $1,100K Ceiling price: $1,200K (The maximum payout to the seller) Share ratio: 70/30 Example A: Actual cost: $800K Savings: $200K (Target cost - Actual cost) Seller gets: $800K + $100K + 60K = $960K (Actual cost + fee + 30%*savings) Buyer saves: $140K Example B: Actual cost: $1,300K Seller gets: $1,200K (no profit and a $100K loss on costs) Buyer loses: $100K (the payout is $100K over Target price = Ceiling Price) FFP: (Lump Sum) Firm-Fixed Price Price: $1,000K Example A: Actual cost: $700K Seller makes a profit of $300K (Price - Actual Cost) Example B: Final cost $1,100K Seller loses $100K on contract
__________________
معماري: هشام محمد سمير ارجو عدم ارسال اي شكر حتي لا يضيع وقت الباحث في تصفح صفحات تخلو من المادة العلمية ![]() |
|
||||
|
Negotiation
Stages of Negotiation: 1. Protocol: Introductions are made, and the negotiators get to know each other. The atmosphere for the rest of the negotiations is determined in this stage. 2. Probing: The negotiators begin the search process. Each party identifies issues of concern. Strengths and weaknesses are identified and possible areas of interest. 3. Scratch Bargaining: This is the essence of the meeting. Actual bargaining occurs and concessions are made. Points of concession are identified. 4. Closure: The two positions are summed up and final concessions are reached. The agreements are summarized and documented. 5. Agreement: The main difficulty in this stage is ensuring both parties have an identical understanding of the agreements. This stage should establish the plans for recording the agreements in a written contract. Negotiation Tactics:The PM should be aware of the following negotiation tactics. • Imposing a deadline for reaching an agreement • A powerful tactic because it implies a possible loss to both parties • Other party does not have to accept deadline, but often does • Surprise -- One party springs information such as a price change on the other party • Stalling • One party may claim that an agreement cannot be finalized because he has limited authority and cannot commit the company's resources. • A party may claim that the person with final authority is absent. The "missing man" technique may also be used when the party does not have the information asked for by the other party. • Fair and reasonable • Negotiator may claim the price for a computer is equitable because that is what another company is paying. • Delays • Useful when tempers are beginning to flare, a team member is going astray, to divert from a subject, etc. • Examples of delays: arrival of refreshments, request for recess, etc. • Reasoning together • Confusing the other party: deliberately distorting issues and figures. (If this is done, someone should speak up before agreeing to anything) • Withdrawal • Sometimes done to divert attention from an area of weakness • One party may make an attack upon an issue, then retreat. • Make the other party appear unreasonable by pointing out all the concessions made by the party • Arbitration - a third party may be brought in when agreement cannot be reached. • Fait accompli - a party may claim that what is being asked for has already been accomplished and cannot be changed. اتعشم الا اكون اطلت مع الشرح الوفي بالعربي يمكن ان نستعين بالانجليزي الان دون تعب للاستفادة من المصطلحات و التعريفات المستخدمة
__________________
معماري: هشام محمد سمير ارجو عدم ارسال اي شكر حتي لا يضيع وقت الباحث في تصفح صفحات تخلو من المادة العلمية ![]() التعديل الأخير تم بواسطة nagopc ; 04-02-2007 الساعة 11:26 PM. |
|
|||
|
البحث عن مصادر الشراء ( الموردين ): تحديد احتياجات والإدارات المختلفة بها من المتطلبات من الأنواع المختلفة من المشتريات سواء كانت سلع أو خدمات.
البحث عن البدائل المختلفة والتي من خلال توافرها يمكن تلبيه مثل هذه الاحتياجات. جمع البيانات عن الموردين الذين من خلال التعامل معهم يمكن تحقيق مستويات الثقة والاعتمادية معهم. مصادر المعلومات المتاحة / الممكنة عن الأصناف والموردين لها. السياسات المرتبطة باختيار مصدر الشراء ( المورد ): سياسة الشراء من مصدر ( مورد ) واحد: المزايا - العيوب - الاتجاهات ). سياسة الشراء من عدة مصادر ( موردين ): المزايا - العيوب - الضمانات ). سياسة الشراء من الموردين المحليين أو من الموردين في الخارج. سياسة الشراء من المنتج بشكل مباشر. المفاضلة فيما بين مزايا و عيوب كل من سياسات الشراء المختلفة. تقييم مصادر الشراء ( الموردين ) و أساليب المفاضلة و المقارنة فيما بينهم: الاعتبارات الأساسية الواجبة الاتباع عند تقييم المورد ( مصدر الشراء ). الاستراتيجيات الرئيسية للمفاضلة فيما بين الموردين. معايير اختيار المصدر ( المورد ) المناسب. حالات عملية. نظام تأهيل الموردين: الخبرات السابقة ( النوع - الحجم ) و المتوقعة مستقبلا. وضع العقود موضع التنفيذ. التقييم الفني للموردين ( الجهاز الفني - خدمات ما بعد البيع أو التوريد - الدعم الفني - الخ ). التقييم المالي للموردين ( الموقف المالي الحالي - البنوك التي يتعامل معها - الخ ). الصفة الرسمية للمورد ( موزع معتمد - وكيل عام - الخ ). مدى توافر متطلبات الأيزو ومعايير الجودة. تقييم أداء الموردين: الأسس الموضوعية المختلفة المستخدمة في تقييم الموردين. الطرق الكمية في تقييم أداء الموردين (طريقة الترتيب - طريقة النقط المرجحة - الخ). تدريب عملي نظم الشراء وتقييم الموردين في ضوء نظم الجودة الشاملة : نظام مطابقة الأصناف المشتراة مع المواصفات المطلوبة. نظام تأهيل الموردين. نظام الرقابة على جودة الأصناف و الأعمال. إجراءات الفحص و التفتيش و تسجيل التالف / الفاقد |
|
|||
|
الاخ العزيز الفاضل
اهنئك على هذا الموضوع الرائع والذى عرض بطريقة ممتازة واضم صوتى لصوت الاخوة بضرورة فتح باب النقاش حوله لاثراءه وزيادة مساحة الاستفادة من هذه الدراسة وكيفية الحصول على البرامج التى ذكرتها فى الدراسة وشكرا جزيلا مرة اخرى |
|
|||
|
الســــلام عليكم ورحمة الله وبركــــاته يوجد هناك عدة عوامل على أساسها يتم تقييم المورد وهي بشكل مختصر ومن دون تعمق كالتالي: · مطابقة المورد للجدول الزمني المرفق لتسليم المادة · اجراءات السلامةالتى يتبعها المورد · التزام المورد بالمواصفات التى يتبع لها وذلك عن طريق ارفاق تقارير فنية توضح جميع الاختبارات الفنية التى تمت على القطعةوهل هي متوافقة مع النتائج الموصي عليها من قبل المصنع أم يوجد هنـــاك حيود. |
|
||||
|
اختنا الفاضلة صناعة المعمار جهد وفير ومعلومات متكاملة وافادة لنا كبيرة وان من اكبر المشكلات التي تواجهنا هي كيفية التقييم الفني الصحيح ومعايير التقييم واوزان المعايير النسبية وسوق العمل عموما ييفتقر الى فهم ماهية التقييم ويحصره في العرض المالي للمتقدمين سواء موردين للمواد او مقاولين للتنفيذ وايضا اشكر جميع الاخوة واخص بالذكر الاخ الفاضل م. nagopc هشام سمير على اضافته الثرية حقيقة اشكركم واشكر صاحبة الموضوع و مجهوداتها جعله الله في موازين اعمالك بكل خير التعديل الأخير تم بواسطة نهر النيييل ; 10-02-2007 الساعة 10:35 AM. |
|
|||
|
اعتقد بأن الزملاء والزميلات المهندسين قد عرضوا الموضوع من كافة جوانبه الايجابية والسلبية وأود مشاركتهم الرأي بزيادة التالي :
كما نعلم نحن دول مستهلكة وليست منتجة , لذلك فمن الضروري جداً الأهتمام بموضوع التوريد ، ودخول بعض الدول العربية مرحلة التصنيع منذ عشر سنوات لايمكن له أن يجعل الدول العربية ذات سيادة اقتصادية كون أن صناعتها بالدرجة الأولى متعلقة بالغير من الدول الصناعية المعروفة وإن إنشاء المدن الصناعية في بعض الدول العربية هو من مبدأ بحث المورد عن الأيدي العاملة الرخيصة كذلك تجربة الصين وماليزيا وغيرهم من الدول التي أصبحت إما تنتج نفس منتجات المورد بمواصفات للتصدير الخارجي أو تقلد المنتج الأصلي وتعرضه بسعر أقل ، مثلاً صناعة الرولمانات المعروفة عالمياً Fag أو Skf أصبحت تنتج في الصين ، السؤال الذي يطرح نفسه أنا كمهندس مقيد بسعر مالي ومدة توريد وعرض فني هل بإمكاني قبول العرض الصيني على العرض الألماني ولنفس المواصفات الفنية كون العرض الصيني أرخص ثمناً ، بسبب أن الشركة المصنعة قللت من سعر التكلفة للوحدة الانتاجية الواحدة من خلال أيدي عاملة رخيصة ، كذلك الأمر دول الاتحاد الأوروبي الجديدة وما حولها على سبيل المثال مقدونيا وبلغاريا ورومانيا ......الخ ، اقترح لحل مثل هكذا تداخلات وبخطوة جدية من الحكومات العربية دعوة الشركات العالمية الكبرى الموردة للعالم العربي بناء مصانع طبق الأصل عن مصانعها في بلد المنشأ على الأراضي العربية وتقديم كافة التسهيلات والاعفاءات الجمركية للمعدات والتجهيزات اللازمة لذلك وتخصيص نسبة 10% من العاملة المحلية للعمل لديها لكسب الخبرات الفنية والعملية للجهة ، مثل تركيا والسعودية والامارات ....الخ لماذا لايكون لدينا مصنع مرسيدس في دمشق مثلاً ونشتري السيارة كما لو كانت من مصنعها في ألمانيا ، كذلك مستلزمات النفط والغاز والاسمنت والمعدات الزراعية والكهربائية .....الخ أو رفع عبئ توريد تجهيزات جديدة لمصانعنا المتهالكة بطرحها للاستثمار الخارجي مع المحافظة على مانسبته من العاملة المحلية وزيادة طاقتها الانتاجية مع الموردين مباشرة لتفادي صفات التوريد بين لجان الدراسة والوكلاء والشركات الموردة وأرتفاع سعر العملة الصعبة واليورو والدولار .....الخ اذكر لكم مثلاً عندما يكون التوريد عكساً من البلاد العربية إلى السوق الأوروبية ولايكون مضبوضاً من النواحي التي تتعلق بالجودة ومراقبة الدولة يعرض اقتصاد بلد كامل للمقاطعة مثل تجارة الشنطة .....الخ لكن في النهاية نحن بحاجة ماسة للتصنيع وبأيدي وطنية وبمواصفات عالمية واليابان خير مثال على ذلك والله الموفق . |
|
|||
|
في حقيقة الامر ان ما نقولة كلنا لايكفي لسد جانب ولو بسيط من مجهود الاخت المشرفة ولكن الامر وخاصتا الموردين من الممكن ان يختلف حسب الاشياء الموردة ويجب علينا جميعا ان نشارك في هذا الموضوع وضرح الاراء كلا حسب عمله أو ( تخصصه)
|
|
|||
|
ادارة المشاريع دائما تتطلب للموردين وجدول القيد الخاص بهم وهذا من ثم له علاقة تزامنية وتأثيرية مع المستوردين
ما هى الطرق القانونية للتعامل مع الموردين الاجانب؟ هل يوجد شكل قانونى بوزارة الصناعة والتجارة او بوزارة الاستثمار مثلا انا احتاج الى مواد خام كيميائية وتلاعب الاسعار هنا في مصر من ناحية الموردين ليس الكل بسعر ولكن يوجد اختلاف في المواصفات القياسية للخامات الموجودة تنافس الاسعار بالزيادة والنقصان هذا يترتب على طبيعة المنتج توجد كثير من الخامات بدرجات متفاوتة في مواصفاتها وهذا يؤثر على طبيعة الانتاج الخامات درجات ولكن انا اريد منتج واحد ثابت من منتجاتى ذات الجودة العالية فهل الجأ مضطر لشراء المواد الخام عالية الثمن مثلا مادة التكسابون يوجد منها بالسوق اكثر من 20 صنف منه ما هو جيد لحد ما ومنه ما هو رديء وكن يوجد ايضا تكسابون ممتاز وعالى الجودة وليس له آثار جانبية على الانتاج وخاصة المستهلك ولكنه غالى جدا في الثمن هذا يكون رد الفعل في التكاليف ان المنتج النهائي يكون باهظ الثمن على المستهلك وانا اعلم تماما ان 99% من شركات مستحضرات التجميل والمنظفات الصناعية تستخدم في منتجاتها ما هو قليل الثمن والمنتج النهائي له اثار رهيبة على المستهلك عند الاستخدام بمعنى مثلا ان مادة التكسابون الرديئة يستخدمونها في صناعة الشامبوهات والمزيلات ومعاجين الاسنان وشامبوهات الاطفال ولقد ارسلت لى بعض الجهات البحثية والعلمية الاجنبية بتحذير من استخدام هذه المادة الرديئة لان لها تأثير ايجابي على المستهلك وخاصة مع تعدد الاستخدام فهي مادة مسرطنة وخاصة منتجات العناية بالشعر فمنها المواد المسرطنة التى تؤدي في البداية الى سقوط الشعر ثم سرطان بالرأس وتؤثر على الغدد اللمفاوية بشكل واضح اما من ناحية الام الحامل فمنتجات العناية بالجسم مثل الشاور ايضا له تأثير ايجابي على الجنين ومنطقة الرحم للأم كما ان معاجين الاسنان لها تأثير ايجابي على اللثة من تقدم الاورام والالتهابات المستمرة فأين هنا الرقابة الصناعية على هذه المنتجات وما بالكم من المواد الحافظة ايضاً التي لها تأثير ايجابي على المدى الطويل وخاصة الاطفال عند تناولهم السلع الغذائية المحفوظة وانا على استعداد تام لتقديم كل التقارير العلمية التى تثبت ذلك عن المواد الكيميائية المسرطنة لجسم الانسان فمن ينقذنا من هذه المأساه ياأخوانى الافاضل اشكر الجميع على حسن استماعهم واستقبال رسائلى التعديل الأخير تم بواسطة صناعة المعمار ; 16-02-2007 الساعة 10:31 AM. سبب آخر: نفس الأخ الكريم |
![]() |