Principles Of Monte Carlo Simulation part #1

  1. #21
    عضو متميز

    User Info Menu

    ملخص للطرق المستخدمة في تحديد و حل المخاطر في المشاريع الهندسية
    Techniques of risk analysis in construction projects include risk premium, risk adjusted discount rate, subjective probability, decision analysis, sensitivity analysis, Monte Carlo simulation, stochastic dominance, Caspar and intuition (Raftery, 1994 and Williams and Heims, 1989). Methods of decision analysis are algorithms, mean end analysis, bayesian theory and decision trees. These provide decision-making tools in an uncertain environment. An algorithm contains a sequence of instructions for problem solving. Mean end analysis is a method of clarifying a chain of objectives to identify a series of decision points(Alkintoye and Macleod, 1997). The decision tree shows sequence of known choices (a number of alternatives) and their possible outcomes graphically in a tree form such that the decision maker can identify best alternatives that achieve the objectives of a major project. The decision tree method is useful in deciding methods of construction, choosing alternative projects, and in contractual problems such as whether to proceed with a claim and assessing the likelihood of a claim succeeding (Thompson and Perry, 1979). Monte Carlo analysis is a form of stochastic simulation. Using this method the probability of project outcome is obtained by carrying out a number of iterations, depending on the degree of confidence required. Probability theory considers all uncertainty random, however, not all types of uncertainty are random. A great deal of management issues in construction does not comply with randomness properties. They are mainly cognitive and thus do not lend themselves to precise measurement (Alkintoye and Macleod, 1997). Caspar is a computer aided simulation for project appraisal and review. It is a project management tool designed to model the interaction of time, resources, cost and revenue throughout the entire life of a project and it has capacity to evaluate the consequences of factors such as delay and inflation, and changes to the market or to production rates. Such computer-based methods recognize the dynamic project environment(Alkintoye and Macleod, 1997). The use of traditional methods which assess risk involved in projects in a deterministic way has been criticized for failing to take into account the sequential nature of construction management process(Huseby and Skogen, 1992).


    0 Not allowed!

  2. #22

  3. #23

  4. #24

  5. #25
    عضو

    User Info Menu

    mawdoooo3 jaied allah y36ek al3afie etha twafaro 3endak ba2e almo7adarat eb3thom allah ye5alek ...


    0 Not allowed!

  6. #26
    عضو

    User Info Menu

    merci kter awe ya bashmohandes


    0 Not allowed!

  7. #27
    عضو فعال جداً

    User Info Menu

    جزاك الله خيرا


    0 Not allowed!

  8. #28
    عضو

    User Info Menu

    رد: Principles Of Monte Carlo Simulation part #1

    الله يعطيك العافية ومشكور على الملف الرائع جدا ونتمنى منك اكثر


    0 Not allowed!

  9. #29
    عضو فائق التميز

    User Info Menu

    رد: Principles Of Monte Carlo Simulation part #1

    جزاكم الله خيرا


    0 Not allowed!

  10. #30
    جديد

    User Info Menu

    رد: Principles Of Monte Carlo Simulation part #1

    جزاك الله كل خير.. وإن أمكن أن تقوم برفع هذا الكتاب أيضا Risk Management, Tricks of the Trade® + PMI-RMP® Exam Prep Guide

    الله الموفق و المستعان


    0 Not allowed!

    من مواضيع hesham_haridi :


صفحة 3 من 4 الأولىالأولى 1234 الأخيرةالأخيرة

الكلمات الدلالية لهذا الموضوع

ضوابط المشاركة

  • لا تستطيع إضافة مواضيع جديدة
  • لا تستطيع الرد على المواضيع
  • لا تستطيع إرفاق ملفات
  • لا تستطيع تعديل مشاركاتك
  •