    $$ Descriptions of software life cycles that are approved for use by the projects are documented and maintained. $$

    Examples of software life cycles include:

    1-waterfall.
    2-overlapping waterfall.
    3-spiral.
    4-serial build.
    5-single prototype/overlapping waterfall.

    A-The software life cycles are compatible with the organization's standard software process.

    B-Changes proposed for the descriptions of software life cycles are documented, reviewed, and approved by the group responsible for the organization's software process activities (e.g., software engineering process group) before they are incorporated.

    C-The descriptions of the software life cycles undergo peer review when initially documented and whenever significant changes or additions are made.

    D-The descriptions of the software life cycles are managed and controlled.

    $$ Guidelines and criteria for the projects' tailoring of the organization's standard software process are developed and maintained. $$

    1-The tailoring guidelines and criteria cover:

    -selecting and tailoring the software life cycle for the project.

    -tailoring the organization's standard software process to accommodate the software life cycle and the project's characteristics.

    Examples of tailoring include:

    1-adapting the process for a new product line or host environment,

    2-customizing the process for a specific project or class of projects.

    3-elaborating and adding detail to the process so that the resulting project's defined software process can be enacted.

    2-Changes proposed for the tailoring guidelines and criteria are documented, reviewed, and approved by the group responsible for the organization's software process activities (e.g., software engineering process group) before they are incorporated.

    3-The tailoring guidelines and criteria are managed and controlled.



    0 Not allowed!

  7. #147

  8. #148

  9. #149

  10. #150
    عضو

    User Info Menu

    السلام عليكم ورحمة الله بركاته نتمنى ان يكون كل مهندسينا بهذه الكفاءة


    0 Not allowed!

الكلمات الدلالية لهذا الموضوع

ضوابط المشاركة

  • لا تستطيع إضافة مواضيع جديدة
  • لا تستطيع الرد على المواضيع
  • لا تستطيع إرفاق ملفات
  • لا تستطيع تعديل مشاركاتك
  •